Direct Vent Closet And Alcove Installation - Rinnai E85SRN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

12" (300 mm)
12" (300 mm)
minimum
EXHAUST
INTAKE
12" (300 mm)
minimum
Terminal positions PVC figure 16
6.6.5
!
WARNING
1"(25mm) minimum clearance
around vent pipes
15"
386mm
10"
254mm
2"
50mm
200mm
1"(25mm) minimum clearance
around hot water pipes
Closet installation
minimum
12" (300 mm)
minimum
12" (300 mm)
minimum

Direct vent closet and alcove installation

For closet and alcove installation, CPVC material, instead of PVC, must be used
in a closet/alcove structure. Failure to follow this warning could result in fire,
personal injury, or death.
Rinnai strongly suggests the use of PPs venting for all closet and alcove
installations. For non direct vent room air applications see sections 6.6.5 and
6.6.8.
6"
148mm
11"
268mm
Closed door
25,4mm
2"
50mm
8"
8"
200mm
figure 17
1"(25mm) minimum clearance
around vent pipes
15"
386mm
10"
254mm
1"
2"
50mm
1"(25mm) minimum clearance
around hot water pipes
Alcove installation
6"
148mm
268mm
Open front
2"
50mm
8"
8"
200mm
200mm
11"
6"
152mm
figure 18
35