Direct Vent Closet And Alcove Installation - Rinnai E50CRN Installation & Servicing Instructions Manual

High effi ciency condensing gas boiler
Table of Contents

Advertisement

12" (300 mm)
minimum
12" (300 mm)
minimum
Terminal positions PVC
6.7.5
!
WARNING
1"(25mm) minimum clearance
around vent pipes
15"
386mm
10"
254mm
2"
50mm
1"(25mm) minimum clearance
around hot water pipes
Closet installation
38
12" (300 mm)
minimum
EXHAUST
INTAKE
12" (300 mm)
minimum
12" (300 mm)
minimum

Direct vent closet and alcove installation

For closet and alcove installation, CPVC material, instead of PVC, must be used
in a closet/alcove structure. Failure to follow this warning could result in fi re,
personal injury, or death.
Rinnai strongly suggests the use of PPs venting for all closet and alcove
installations. For non direct vent room air applications see sections 6.7.5 and
6.7.8.
6"
148mm
2"
50mm
8"
8"
200mm
200mm
fi gure 16
1"(25mm) minimum clearance
11"
268mm
10"
254mm
Closed door
1"
25,4mm
50mm
1"(25mm) minimum clearance
around hot water pipes
fi gure 17
Alcove installation
around vent pipes
15"
386mm
2"
8"
200mm
200mm
6"
148mm
11"
268mm
Open front
6"
152mm
2"
50mm
8"
fi gure 18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E75crnE110crpE75crpE110crn

Table of Contents