Advertisement

Quick Links

GB
Installation and Operating Manual
Nova F

Advertisement

Table of Contents
loading

Summary of Contents for Spartherm Nova F

  • Page 1 Installation and Operating Manual Nova F...
  • Page 2 PREFACE – QUALITY PHILOSOPHY You have decided in favor of SPARTHERM fireplace inserts. Thank you very much for your trust in our company. In a world of excess and mass production, our company stands for the values expressed by our owner, Mr. Gerhard Manfred Rokossa: „High technical quality combined with contemporary design, and service to the...
  • Page 3: Table Of Contents

    CONTENT 1. General instructions 7. Rating plate 1.1 Scope of delivery 1.2 Technical data 8. General warranty terms and conditions 8.1 Scope of Application 2. Installation 8.2 General information 2.1 Minimum cross sections - convection air 8.3 Warranty period 2.2 Chimney connection / connecting pieces 8.4 Requirement of Effectiveness for the Warranty 2.3 Installation of rotating disc / air adjustment lever / 8.5 Warranty exclusions...
  • Page 4: General Instructions

    1. GENERAL INSTRUCTIONS Prior to setup and installation of the tiled stove system, Nova F, a discussion The fireplace can be operated manually or with suitable combustion control- must be conducted with your responsible district master chimney sweep. He lers and appropriate settings. If necessary, consult with Spartherm Feu- will advise you of building law regulations, the suitability of your chimney, erungstechnik GmbH in this regard.
  • Page 5: Technical Data

    2.7 kg of dry pieces of beech wood is burned and air grates in the heating chamber, in accordance with DIN EN 13229. If a the Spartherm metallic coasting temperature box (coasting temperature closed heating chamber should be created, the thermal insulation material unit) is installed.
  • Page 6 Fig. 1a Fig. 1b Nova F Nova F with wall-penetrating element with front panel and external firing unit GB 6...
  • Page 7: Installation

    The minimum cross sections for convection air (supply air and recirculating air) in the cladding or in the heating chamber must be designed as follows. For installation, connection and operation of the Nova F fireplace insert, all necessary national and European standards, as well as local regulations Hot air: 2250 cm²...
  • Page 8: Chimney Connection / Connecting Pieces

    ( chamotte brick no.: 7 and 8 Fig. 4) and of the combustion chamber floor The Nova F is connected to the chimney with the connecting pieces made are necessary. Installation of the air mechanism must be executed as shown from steel sheet at least 2 mm thick.
  • Page 9: Connection Of Combustion Air / Installation Of S-Thermatik, Motor / Air Box

    2.4 CONNECTION OF COMBUSTION AIR / INSTALLA- TION OF S-THERMATIK, MOTOR / AIR BOX Step 2.2: After removing the air controller parts, the S-Thermatik motor Installation sequence - combustion air connection: is screwed on under the floor of the device. Step 1.1: Unscrew the screws in the combustion chamber floor.
  • Page 10 b) Then open the door as far as possible and deactivate design A1. To do this, tighten the grub screw that is located on the bottom on the hinge side with an Allen key. Then take the tiled stove door out of the tiled stove - to do this lift the door on the hinge side and pull it downwards and forwards.
  • Page 11: Combustion Chamber Lining

    2.6 COMBUSTION CHAMBER LINING Installation of the combustion chamber lining: The individual chamotte bricks of the combustion chamber lining must be i nstalled as numbered, starting with num- ber (1). The rear baffle plate (10) must be introduced diagonally into the combustion chamber until it is above the side walls.
  • Page 12: Initial Commissioning

    The instructions in this installation and operating (see example). During the combustion manual refer to special operation of a heating insert, such as the Nova F. phase the air lever can be opened for several minutes.
  • Page 13: Fuel

    The instructions in this installation and operating • Wood from Euro Pool pallets manual refer only to the cleaning of the heat exchanger of the Nova F. Bear • Rubbish, household waste, old clothes in mind that through cleaning, contamination of the setup room and the •...
  • Page 14: General Warranty Terms And Conditions

    Setting up or installing this product requires specialized knowledge. If such proof is not produced Spartherm Feuerungstechnik GmbH shall not Our products may therefore only be installed and commissioned by special- be obliged to honour the warranty.
  • Page 15: Defect Remediation/Repairs

    Damage and compensation claims not based on a defective unit supplied • Non-observance of the installation and operating instructions by Spartherm Feuerungstechnik GmbH are excluded and are not covered by • Technical modifications to the unit by third parties the warranty undertaking.
  • Page 16: Commissioning Protocol

    9. COMMISSIONING PROTOCOL Device no.: Date: see rating plate) Name and address of fireplace operator Name and address of heating system installation company: Name and address of stove fitter: Heating system ventilated: Has the actual delivery pressure been checked? Negative pressures greater than 20-25 Pa can influence correct operation.
  • Page 17 NOTES GB 17...
  • Page 18 NOTES GB 18...
  • Page 19 GB 19...
  • Page 20 IT Il vostro rivenditore specializzato | E Sus comercios especializados NL Uw vakhandelaar | PL Państwa sprzedawca | РУС Ваш дилер Spartherm Feuerungstechnik GmbH · Maschweg 38 · D-49324 Melle Phone +49 (0) 5422 94 41-0 · Fax +49 (0) 5422 9441-14 · www.spartherm.com GB 20...

This manual is also suitable for:

Renova b

Table of Contents