INSTALLATION
MANTEL LEG
CLEARANCES
Combustible mantel leg clearances as per
diagram below:
152mm S ide Wal l
P 36
F ireplace
Maximum
38mm
51mm
projection
at 51mm
127mm
minimum
Allowable mantel leg
clearance.
projection.
Mntle g2.e ps
FRAMING AND
FINISHING
1) Determine the total thickness of facing
material (e.g. drywall plus ceramic tiles) to
allow the finished surface to be flush with
the front of the unit. Total facing thickness
can vary from 1/2" (13mm) to 1-1/4" (32mm)
thick.
Install Side Nailing Strips, Top Facing
Support, and Top Standoffs before
unit is slipped into position. See "Unit
Assembly Prior to Installation" section
for assembly details.
NOTE:
When using the Premium Flush Front
option, a finishing trim (962mm cover)
needs to be installed to cover the
spacers.
Maintain a physical gap between lining
and spacers 2-5mm. (5mm clearance to
framing each side).
8
2) Frame in the enclosure for the unit with
framing material.
Standard Framing Dimensions
A
B
C
36-1/4"
36-1/4"
12-3/4"
921mm
921mm
324mm
Framing Dimensions with
Premium Flush Front Option
A
B
C
37-1/4"
37-1/4"
17-3/8"
944mm
946mm
432mm
* 'D' is Minimum height to combustible mate-
rials including the Minimum 2" (51mm) Top
clearance to the Horizontal Flue, see flue
clearances in section "Clearances."
3) For exterior walls, insulate the enclosure to
the same degree as the rest of the house,
apply vapour barrier and drywall, as per
local installation codes. (Do not insulate
the fireplace itself.)
4) The top of the unit must not be closer than
32" (813mm) to the ceiling.
Top Header
1/2"
(13mm)
Drywall
2"
(51mm)
3-1/2"
(89mm)
Opening for gas
connection
D
Note: 40-1/2" (1029mm) is the minimum
height for both flex termination or
46"*
Simpson Dura-Vent flueing.
1126mm*
Note:The unit does not have to be completely
enclosed in a chase. The clearance on
top of the unit is 0" to the standoffs so
combustible building materials can be
D
laid directly on top of the standoffs. You
46-1/2"*
must maintain 1-1/2" (38mm) clearance
1182mm*
from the flue to combustible materials
for flex (1-1/4"
Dura-Vent).
5) Use steel studs for framing where the
1-1/2" (38mm) clearance from the flue to
combustible material cannot be maintained,
e.g. front top header.
Premium Flush Front Framing
Do not use combustible material as lining (eg.
timber) around the fireplace as shown in the
shaded area in the diagram below.
Regency
10" (254mm) dia. hole
through wall for Flex
or for DuraVent
12-3/4"
4"
(102mm)
(324mm)
(32mm) for Simpson
PG36-5 Gas Log Fireplace
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg36lpg5-r

Table of Contents