Ferroli Xignal Service Instructions Manual page 24

Wall mounted, room sealed, wall mounted, room sealed, fan assisted, gas combination boiler, fan assisted, gas combination boiler, computerised and synthesized voice
Table of Contents

Advertisement

Delicately
Delicately
Delicately
Delicately
Delicately depress pin "d" and keep it fully pressed down. If the maximum pressure value must be
adjusted, slowly turn adjuster nut "e" in a clockwise direction to increase the pressure and in an
anticlockwise direction to lower the pressure value.
Having regulated the minimum and maximum pressure values, reset compensating tap "b". The current
value should now be reset to 165 mA.
Disactivate the TEST function by depressing button
automatically.
NOTE
NOTE
NOTE - The above listed adjustments establish the mechanical travel of the plunger of the "Modureg"
NOTE
NOTE
modulator between a minimum and maximum setting.
NOTE
NOTE
NOTE
NOTE - The complete "Modureg" unit must be replaced if the "Modureg" coil fails to operate. Any attempts
NOTE
to replace the coil alone would irreparably jeopardize the "Modureg" setting.
Anyone carrying out adjustments with these nut should proceed very delicately.
Anyone carrying out adjustments with these nut should proceed very delicately.
Anyone carrying out adjustments with these nut should proceed very delicately.
Anyone carrying out adjustments with these nut should proceed very delicately.
Anyone carrying out adjustments with these nut should proceed very delicately.
HONEYWELL valve VR 4605 NA 2007
HONEYWELL valve VR 4605 NA 2007
HONEYWELL valve VR 4605 NA 2007
HONEYWELL valve VR 4605 NA 2007 (fig. 18)
HONEYWELL valve VR 4605 NA 2007
Key
Key
Key
Key
Key
1. 1. 1. 1. 1. Inlet pressure test point
2. 2. 2. 2. 2. Outlet pressure test point
a. a. a. a. a. Electrical coil connection
b. b. b. b. b. Balance cap
c. c. c. c. c. Minimum pressure regulating nut
d. d. d. d. d. Maximum pressure pin
e. e. e. e. e. Maximum pressure regulating nut
f. f. f. f. f. "Adapter" fitting (only on L.P.G. versions)
g. g. g. g. g. Protective cap
24
TEST ACTIVATED
CURRENT 165 mA
. The boiler will now be ready to operate
d d d d d
e e e e e
c c c c c
b b b b b
a a a a a
g g g g g
2 2 2 2 2
f f f f f
1 1 1 1 1
Fig. 23