Quadra-Fire TOPAZ-MBK-IPI Installation Manual page 43

Hide thumbs Also See for TOPAZ-MBK-IPI:
Table of Contents

Advertisement

Install Horizontal Termination Cap
WARNING! Risk of Fire! The telescoping flue section of the
termination cap MUST be used when connecting vent.
• 1-1/2 (38 mm) minimum overlap of flue telescoping
section is required.
Failure to maintain overlap may cause overheating and fire.
• Vent termination must not be recessed in the wall. Siding
may be brought to the edge of the cap base.
• Flash and seal as appropriate for siding material at outside
edges of cap.
• When installing a horizontal termination cap, follow the cap
location guidelines as prescribed by current ANSI Z223.1
and CAN/CGA-B149 installation codes and refer to
Section 6 of this manual.
CAUTION! Risk of Burns! Local codes may require
installation of a cap shield to prevent anything or anyone
from touching the hot cap.
NOTICE: For certain exposures which require superior
resistance to wind-driven rain penetration, a flashing kit and
HRC caps are available. When penetrating a brick wall, a
brick extension kit is available for framing the brick.
Note: When using termination caps with factory-supplied
heat shield attached, no additional wall shield firestop is
required on the exterior side of a combustible wall.
Figure 7.17 Venting through the wall
43
Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
Heat Shield or
Extended Heat Shield
SLIP SECTION
CAN BE EXTENDED
Wall
Shield
Firestop
Heat
Shield
WALL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Topazd-pmh-ipiTopazd-mbk-ipiTopazd-csb-ipi

Table of Contents