Mounting Internal Rack Components - IBM pSeries 670 Installation Manual

Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

Item 10 in illustration on page
43.

Mounting Internal Rack Components

To mount the internal rack components, do the following:
Attention:
This procedure is performed by the service representative.
1. Using four M-8 (20 mm) screws (item 1 in illustration on page 43), install the top shipping bar (item 2
in illustration on page 43) at EIA unit location 32.
2. Using four M-8 screws (item 1 in illustration on page 43), install the bottom shipping bar (item 3 in
illustration on page 43) at EIA unit location 18.
3. Repeat steps 1 and 2 to install shipping bars in the rear of the rack.
4. Attach the front top hinge (item 5 in illustration on page 43) on the vertical rail (located approximately
at EIA unit 29-30 on the vertical rail) with two 25 mm screws (item 9 in illustration on page 43) and
two washers (item 10 in illustration on page 43).
5. Attach the front bottom hinge (item 5 in illustration on page 43) on the vertical rail (located
approximately on EIA unit 6-7 on the vertical rail) with two 25 mm screws (item 9 in illustration on
page 43) and two washers (item 10 in illustration on page 43).
6. Repeat steps 4 and 5 to install the hinges on the rear rail.
7. Attach the latch plate (item 8 in illustration on page 43) with two M-8 (20 mm) screws (item 1 in
illustration on page 43).
8. Repeat step 7 to attach the latch plate in the rear of the rack.
9. Attach the triangular braces (item 6 in illustration on page 43) in both the front and rear of the rack.
10. Install the latch bolts (item 7 in illustration on page 43).
1
2
5
9
10
1
8
3
6
7
1
Screw (hex flange, 20 mm long)
1622307
1
5
9
10
8
Washer (M-8, hinge)
5
9
10
2
5
8
9
10
3
Rack
7
Latch Bolt
6
Appendix D. Securing the Rack
43