Mounting Internal Rack Components - IBM pSeries 670 Installation Manual

Eserver
Hide thumbs Also See for pSeries 670:
Table of Contents

Advertisement

Mounting Internal Rack Components

To mount the internal rack components, do the following:
Attention:
This procedure is performed by the service representative.
1. Using four M-8 (20 mm) screws (item 1 in illustration 112), install the top shipping bar (item 2 in
illustration 112) at EIA unit location 32.
2. Using four M-8 screws (item 1 in illustration 112), install the bottom shipping bar (item 3 in illustration
112) at EIA unit location 18.
3. Repeat steps 1 and 2 to install shipping bars in the rear of the rack.
4. Attach the front top hinge (item 5 in illustration 112) on the vertical rail (located approximately at EIA
unit 29-30 on the vertical rail) with two 25 mm screws (item 9 in illustration 112) and two washers
(item 10 in illustration 112).
5. Attach the front bottom hinge (item 5 in illustration 112) on the vertical rail (located approximately on
EIA unit 6-7 on the vertical rail) with two 25 mm screws (item 9 in illustration 112) and two washers
(item 10 in illustration 112).
6. Repeat steps 4 and 5 to install the hinges on the rear rail.
7. Attach the latch plate (item 8 in illustration 112) with two M-8 (20 mm) screws (item 1 in illustration
112).
8. Repeat step 7 to attach the latch plate in the rear of the rack.
9. Attach the triangular braces (item 6 in illustration 112) in both the front and rear of the rack.
10. Install the latch bolts (item 7 in illustration 112).
5
9
10
8
6
7
1 Screw (hex flange, 20 mm long)
2 Shipping bar (upper)
3 Shipping bar (lower)
5 Hinge Plate
6 EQ Support
112
Eserver pSeries 670 Installation Guide
1
2
1
3
1
5
9
10
5
9
10
2
5
8
9
10
3
Rack
7 Latch Bolt
8 Latch Plate
9 Screw (hex, 25mm, long, hinge)
10 Washer (M 8, hinge)
6

Advertisement

Table of Contents
loading

Table of Contents