Check after installation

Check according to the following requirement after finishing installation.

Items to be checked

Has the unit been installed rmly?
Have you done the refrigerant leakage
test?
Is heat insulation of pipeline suf cient?
Is water drained well?
Is the voltage of power supply accord-
ing to the voltage marked on the
nameplate?
Is electric wiring and pipeline installed
correctly?
Is the unit grounded securely?
Does the power cord follow the speci-
cation?
Is there any obstruction in the air inlet
and outlet?
The dust and sundries caused during
installation are removed?
The gas valve and liquid valve of
connection pipe are open completely?

Test operation

1. Preparation of test operation

Specify the important notes for air conditioner to the client.

2. Method of test operation

Put through the power, press ON/OFF button on the remote controller to start
operation.
Press MODE button to select AUTO, COOL, DRY, FAN and HEAT to check
whether the operation is normal or not.
If the ambient temperature is lower than 16
start cooling.
B
Possible malfunction
The unit may drop, shake or emit noise.
It may cause insuf cient cooling
(heating) capacity.
It may cause condensation and water
dripping.
It may cause condensation and water
dripping.
It may cause malfunction or damaging
the parts.
It may cause malfunction or damaging
the parts.
It may cause electric leakage.
It may cause malfunction or damaging
the parts.
It may cause insuf cient cooling
(heating) capacity.
It may cause malfunction or damaging
the parts.
It may cause insuf cient cooling
(heating) capacity.
, the air conditioner can't
29
GB