Receiving & Unpacking; Installation - Cornelius MILLENNIUM MJ41-6PB Installation & Service Manual

Table of Contents

Advertisement

Receiving & Unpacking
1.
Inspect the carton and note any damage,
regardless if it appears minor. If the carton is
damaged, note on the consignee copy of the
freight invoice "exterior carton damage -
concealed damage possible."
2.
Cut the plastic banding strap and remove the
exterior carton sleeve, internal fillers and
plastic bag around the dispenser. Carefully
inspect for damage.
Note: Wilshire is not responsible for damaged
freight. If damage is found, you must save all
packaging material and contact the freight
carrier. Failure to contact the carrier within 48
hours of receipt may void your claim.
3. Confirm receipt of the installation kit
#48458 packaged with the dispenser. If any
item is missing, contact our customer
service
department
Monday-Friday between the hours of 8:00
AM & 4:30 PM CST.
Kit Contents:
Qty
Description
1 3/8"
Barb
2
3/8" swivel nut
7
3/8"x3/8" elbow barb
8
3/8" nylon washer
2
#170 clamps
12
#140 clamps
4 ft.
3/8" braided tubing
6 ft.
1/2" I.D. clear tubing
1
1/2"x1/2" 90
6
Generic B-I-B connectors
2
Flavor strip kits
1
Installation template
4.
Remove the four 9/16" (15 mm) retaining
bolts from the underside of the shipping
pallet by carefully tilting the dispenser from
side to side.
5.
With the assistance of another person, lift
the dispenser from under the base and place
it on the counter.
The dispenser is extremely heavy when
operational. Make certain the counter
at
1-800-344-3801
o
elbow
can support a minimum of 300 lbs.
directly below the dispenser.

Installation

Typically the dispenser is placed directly on the
counter and a food grade silicone sealant applied
around the base. However, an optional leg kit
(# 48499)
is
available.
instructions assume the optional leg kit will not
be used.
Depending on the type of counter, it may be
necessary to provide access through the counter
at the rear of the dispenser for the drain, power,
water and concentrate connections.
Refer to the template enclosed in the
installation kit.
Connect Water Supply:
Water pipe connections and fixtures directly
connected to a potable water supply shall be
sized, installed, and maintained according to
federal, state, and local laws.
Wilshire recommends that a ½" O.D. copper
supply line with a shut-off valve and water filter
be located within 3-6 feet (0.91-1.83 m) of the
dispenser.
a. Assemble the 3/8" braided water supply line
furnished in the Installation Kit by attaching the
straight barb on one end and the elbow barb on
the other. Secure with clamps provided.
b. Insert a 3/8" nylon washer into the elbow
barb of the supply
line. Connect the
assembled
supply
line to the water
inlet fitting located
on the rear of the
dispenser
c. Connect the water supply line to the shut
off. Turn on the water and check for leaks.
NOTE: The dynamic water pressure must be 20
PSIG (1.4 bar) minimum to ensure correct valve
flow control and must not exceed 100 PSIG (7
bar) to avoid valve damage.
4
The
following

Advertisement

Table of Contents
loading

Table of Contents