Activating The Terminal - Hughes Jupiter HT1100 Installation Manual

Hide thumbs Also See for Jupiter HT1100:
Table of Contents

Advertisement

Activating the terminal

The next step in the process is activating the terminal. The terminal activation
process associates the SAN with the ESN.
1. Make sure your laptop computer is connected to the modem's LAN port.
2. Click the HT1100 Registration tab at the top of the screen.
3. The installation home page appears, showing the
Terminal Activation
is ready to be activated (after commissioning is complete). The link is not
present after activation is completed.
4. Click the
Terminal Activation
Figure 30: Terminal Activation link
If you see a Page not found error, check the following:
• Make sure the modem is powered on.
• Check the Ethernet connection. The orange LED on the LAN port should blink
if you send data from the computer to the modem.
• Make sure a router is not connected between the modem and the PC.
• Before proceeding to the next step, make sure at least 5 minutes have passed
since the Terminal Initialization Sequence. This allows the modem to
complete its final configuration.
5. The HughesNet Activation screen appears as shown in Figure 31.
link appears only on a new installation when the modem
link as shown in Figure 30.
Chapter 7 • Activating the terminal
Chapter 7
Terminal Activation
link. The
1039649-0001 Revision C
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht2000w

Table of Contents