Section 4 – Installation; Installing Welding Generator (See Sections 4-2 And 4-3); Using Lifting Eye - Miller Electric Big 40 WG Owner's Manual

Engine driven welding generator
Table of Contents

Advertisement

4-1. Installing Welding Generator (See Sections 4-2 And 4-3)

Movement
OR
Grounding
2

4-2. Using Lifting Eye

OM-4405 Page 14
SECTION 4 – INSTALLATION
Airflow Clearance
18 in
(460 mm)
18 in
(460 mm)
1
OR
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
3
4
GND/PE
2
install2 1/01 – Ref. 800 652 / Ref. 800 477-A / 158 936-A / 0854
1
2
3
Location
OR
Y Always
securely
fasten
welding
generator
onto
transport vehicle or trailer
and comply with all DOT and
other applicable codes.
Y Always ground generator
frame to vehicle frame to pre-
vent electric shock and static
electricity hazards.
1
Generator Base
2
Metal Vehicle Frame
3
Equipment Grounding
Terminal
4
Grounding Cable
Use #10 AWG or larger insulated
copper wire.
Y If unit does not have GFCI re-
ceptacles,
use
GFCI-
protected extension cord.
1
Lifting Eye
2
Nut
3
Carriage Bolt
Raise lifting eye until it snaps in
place. Lower lifting eye when not
needed.
.
To lock the lifting eye in the up-
right position, insert a 3/8-16 x
1-1/2 in carriage bolt through
slot in bracket and secure with
nut (bolt and nut not supplied).
Tools Needed:
Ref. 802 729

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents