Initial start-up, inspection, maintenance
Further details regarding the individual steps
!
Outside temperature sensor
?
Flow temperature sensor
%
Cylinder temperature sensor
sÖ
Heating circuit pump
lH
Mains supply (extension kit)
aVG KM BUS
Required coding
One heating circuit with mixer with extension kit for mixer
and one heating circuit with mixer with Vitotronic 050
&
with DHW cylinder
&
without DHW cylinder
Operation with natural gas (as delivered condition)
or
Operation with LPG
System design 5
With one heating circuit without mixer A1, solar panels and Vitocell-W 100
DHW cylinder (type CVB) installed adjacent to the boiler
30
(cont.)
A
Extension kit for one heating cir-
cuit with mixer
B
Vitotronic 050
C
Maximum temperature controller
(underfloor heating)
Address
00:4
00:3
1E:0
1E:1