Haier HB21FWRSS Service Manual page 10

Hide thumbs Also See for HB21FWRSS:
Table of Contents

Advertisement

Pipes connecting
7. Connect the pipe to the valve
Put the Tightened nuts and the copper shaft on the end side of the pipe and
connect the pipe to the stopping valve. Make sure that the pipe is cut into the
valve completely. Tighten and press the nut.
Standard. Saddle-backed is unlawful in Massachusetts and is forbidden. Please
consult the plumber's mate with working license.
8. Clean the Pipe
Power the main water supply till the water in the pipe becomes clean. Turn off the
water valve after having used water of about 1v.
9. Connect the pipe to the refrigerator.
Before connecting the pipe to the refrigerator, make sure that the power line is not cut into
the electric plug on the wall.
Note
(1) Tighten the water pipe on the water valve and take the nut off the water
pipe.
the water valve; tighten the water pipe using tightening nuts.
4. Operation of the Chill-cold storage Vertical Girder
The chill-cold storage vertical girder goes around the vertical girder orientation shaft when the chill-cold
storage left door body is opened. After the chill-cold storage left door body is opened, don't circle the
chill-cold storage vertical girder with your hands, in case the door may not be closed.

Advertisement

Table of Contents
loading

Table of Contents