Installation - Empire Comfort Systems DVX36DP31N-2 Installation Instructions And Owner's Manual

Table of Contents

Advertisement

Framing and Finishing
1.
Choose unit location.
2.
Frame in fireplace with a header across the top. It is important
to allow for finished face when setting the depth of the frame.
3.
Attach fireplace to frame using adjustable nailing flange. Preset
depth to suit facing material (adjustable to 3/8", 1/2" or 3/4" depths).
Note: Fireplace must mount flush to facing material. If facing
material requires more depth than 3/4" mark and drill two (2) 1/8"
holes into fireplace side at appropriate depth. See Figure 9.
4.
Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of drywall strip to determine final depth.
Vent Pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent
pipe. See Figure 11. For horizontal vent, maintain a minimum 1"
clearance to the bottom and sides of the vent, and 3" clearance to
combustibles above the vent pipe. See Figure 12.
USE OUTER
(4) FLANGES
FOR 1/2"
DRYWALL
28653-2-0811

INSTALLATION

Figure 9
Figure 10
VENT PIPE
1" MINIMUM CLEARANCE AROUND VENT PIPE
Figure 11
Figure 12
Page 11

Advertisement

Table of Contents
loading

Table of Contents