Travis Industries 564 SS GS2 Installation Manual page 76

Hide thumbs Also See for 564 SS GS2:
Table of Contents

Advertisement

76
Optional Equipment
16. Disconnect the IPI/CP switch from IPI/CP wires. Attach one of the jumper wires to the two wires.
Discard the IPI/CP switch.
17. Remove the IPI/CPI switch and place aside (may be kept for spare parts).
18. Connect the accent light wires to the GSR2 IFC.
NOTE: If using a blower, connect the power input to the GSR2 IFC.
19. Connect the battery box power molex connector to the main harness molex connector.
© Travis Industries
(for qualified installers only)
4141208
100-01397

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents