Installation; Downtime After Installation; Levelling The Tumble Dryer - Miele PDR 908 HP Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Installation

Ensure that no closeable door,
sliding door, or an oppositely hinged
door is installed that would hinder
the door of the dryer being opened in
any way.

Downtime after installation

Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
switching it on.

Levelling the tumble dryer

The tumble dryer must stand perfectly
level to ensure safe and proper
operation.
Installation and connection
The screw feet can be adjusted to
compensate for unevenness in the floor.
This tumble dryer is not suitable for
building under.
Never block the ventilation slots on
the tumble dryer. Do not block the
gap between the bottom of the
tumble dryer and the floor with plinth
facings, deep pile carpet, etc. This
would hinder a sufficient flow of air
to the tumble dryer.
81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents