GE LOGIQ E9 Service Manual page 517

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
8-9-6-2
BEP Battery Pack - BEP6.x installation
Table 8-147 BEP Battery Pack - BEP6.x installation
1.
Route the battery cable through the cable opening into the BEP and position the BEP Battery
Pack into place.
2.
Install the battery stabilizer strips beside the Battery Pack.
3.
Install the Battery Pack Cover and the four screws that secure the Battery Pack Cover to the BEP
cover. Tighten screws securely.
4.
Loosen the thumb screws or screws at the top of the BEP cover that attach the cover to the BEP.
Tilt the top of the BEP cover away from the BEP.
5.
Connect the battery cable to PCN1 on the CB.
6.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
Be careful not to pinch any of the cables when installing the BEP cover.
7.
Tighten and secure the thumb screws at the top of the BEP cover, or the three screws that attach
the cover to the BEP.
8.
Replace the side cover.
9.
Perform Functional Checks. See:
8-9-6-4 - Verification
NOTE:
ALL batteries MUST BE recycled or disposed of in accordance with local, state, or country laws.
. 2
EV
Steps
NOTICE
and
Chapter 8 Replacement procedures
8-9-6-3 - Calibration and
8-9-6-5 "Functional Checks" on page 8-234
LOGIQ E9 S
ERVICE
Corresponding Graphic
adjustments,
M
ANUAL
8 - 233

Advertisement

Table of Contents
loading

Table of Contents