D
5573152-100, R
IRECTION
Table 8-80
6.
Install the Ground Cable to the Adapter and
to the Bulkhead using the two screws and
lock washers. Torque 1.3 Nm (0.96 lbf-ft
{11.5 lbf-in}).
DO NOT connect the Monitor power cable to the power (P2) or (P3) connector on the Bulkhead
when the LOGIQ E9 is powered up. Damage to the Monitor Power Cable and/or the Bulkhead
Board can occur. See: images below of damage that can occur.
7.
Re-install the Monitor and Arm Assembly and connect the Monitor Cables.
8.
Install the Bulkhead Cover.
8 - 132
. 2
EV
V2 Arm Adapter installation
Steps
NOTICE
48VDC pin in the P3 connector (center pin), shows damage.
The outside two pins are Ground. Cable left, Bulkhead Connector right.
Section 8-6 - Replacing Top Console Parts
LOGIQ E9 S
Corresponding Graphic
Ground Cable installed (R5 shown)
M
ERVICE
ANUAL