Sign In
Upload
Manuals
Brands
Unipower Manuals
Measuring Instruments
UP2210
Unipower UP2210 Manuals
Manuals and User Guides for Unipower UP2210. We have
3
Unipower UP2210 manuals available for free PDF download: Hardware Installation And Configuration Manual, Installation And Configuration Manual
Unipower UP2210 Hardware Installation And Configuration Manual (119 pages)
Brand:
Unipower
| Category:
Measuring Instruments
| Size: 8 MB
Table of Contents
Introduction
2
Table of Contents
3
Safety Information
6
Installation Conditions
6
Installing the Instrument
6
Power Supply
7
Product End of Life
7
Undertaking and Warranty
7
Liability
7
Warranties
7
Patent
8
Components of the Pq Secure System
9
Measuring Device
10
Communication
10
Portable Meter Unilyzer 900 / Unilyzer 900C
11
Software
11
Server Performance
12
Installing Permanent Meter Up-2210R/P
13
Location and Fitting
13
Installation Diagram
15
Connection Points
15
Connection Alternatives
18
Phase with 4 Wire Measurement with Direct Voltage and 3 Ct's
19
Phase with 4 Wire Measurement with Direct Voltage and 2 Ct's
20
Phase with 4 Wire Measurement with 3 Ct's and 3 Pt's
21
Phase with 4 Wire Measurement with 2 Ct's and 3 Pt's
22
Phase with 4 Wire Measurement with 3 Ct's and 2 Pt's
23
3-Phase 4 Wire Measurement with 2 Ct's and 2 Pt's
24
1-Phase Measurement with Direct Voltage and One CT (Line-To-Neutral Voltage)
25
1-Phase Measurement with One PT and One CT
26
HV 3-Phase Measurement with 2 Ct's and 2 Pt's (Line-To-Line Voltages)
27
HV 3-Phase Measurement with 3 Ct's and 2 Pt's (Line-To-Line Voltages)
28
HV 3-Phase Measurement with 2 Ct's and 3 Pt's (Line-To-Line Voltages)
29
HV 3-Phase Measurement with 3 Ct's and 3 Pt's (Line-To-Line Voltages)
30
3-Phase Measurement with Direct Voltage, 2 Ct´s (Line-To-Neutral)
31
3-Phase Measurement with Direct Voltage, 3 Ct´s and Neutral (Line-To-Neutral Voltages)
32
Split Phase 2CT 2PT
33
Sp 2Ct DV
34
Connecting SENSE Voltage Inputs
35
HV/MV Earth Fault Monitoring Via Channel U4
37
Vector Graph for Correct Connection
38
Recommended Practices
39
Impedance Grounded 3-Wire Systems
39
Effectively (Directly) Grounded 3-Wire Systems
39
Isolated (Ungrounded) 3-Wire Systems
40
Low Voltage 4- or 5-Wire Systems
40
Alternative Connection Option for MV/HV 3-Wire Systems
40
Digital Inputs and Outputs
40
Connection of Digital Inputs
41
Connection of Digital Outputs
41
Energy Pulses S0 Interface
42
Replaceable Power Supply and Micro Sd Card
43
Substation Display
44
Pq Online Substation Display Configuration
45
Display
47
Installing Communication Equipment
48
Ethernet
48
Wireless Gsm/3G Router
48
Using Multiple Meters with Westermo Gdw-11 Gsm/Gprs- Modem and Rs-485
52
Modbus
54
Binary Registers 16 Bit Signed
54
Floating-Point Registers
57
Gps Clock Synchronisation Module
62
Installation
63
GPS Communication Configuration
63
Irig-B
63
Useful Information Regarding Gps
63
Gps Connection Instruction for Up2210R
65
Attaching Several Up2210R to the same Gps
66
Installing Software
67
Installation Procedure
67
Installation Program
67
Installing Pq Online
68
Installing Pq Online 3
68
Additional Command Line Parameters
68
Installing Unilauncher
68
Pq Online
71
Main Window
71
Connect
72
Meter Settings
74
Change Settings Using the Configuration Wizard
74
EN50160 Templates
75
Creating a New Configuration Template
77
Review Configuration
80
Store Settings
80
Advanced Settings
81
General Settings (1)
81
Measure Site Properties (2)
82
Signalling (2.6)
82
Detection Threshold (2.6.1)
83
Ripple Frequency (2.6.2)
83
Storage Intervals (3)
84
Disturbances (4)
84
Sags/Swells Events
85
Voltage Triggers (4.2)
86
Current Triggers (4.3)
87
Transient Triggers (4.4)
88
Slowscan Settings (5)
91
Common Settings (5.1)
91
Voltage Triggers (5.2)
92
Current Triggers (5.3)
92
Frequency Triggers (5.4)
92
Power Triggers (5.5)
92
Digital Inputs (6)
93
Fault Recorder (6.1) (Optional)
93
PQ Control / Digital Outputs (7)
93
Power Quality Events (7.1)
94
Disturbances (7.2)
94
Weekly 95% Settings (7.3)
94
Harmonics (7.4)
94
Harmonic Bandwidth Extension HBE (Option)
95
Real-Time
97
Values Tab
98
Trend Graph
99
Oscilloscope Tab
101
Communication Settings
102
Ethernet
102
DHCP and Smartcom
103
Iec 61850
103
10.6.7 TLS Encryption
104
Download Data
105
Tools
106
Language
107
Usb Port
107
Upgrading Meter Firmware
108
Adding Meter Options
111
Pq Online Login
111
Appendix - Comissioning Checklists
113
Meter Installation Checklist
113
Index
118
Advertisement
Unipower UP2210 Hardware Installation And Configuration Manual (90 pages)
Brand:
Unipower
| Category:
Measuring Instruments
| Size: 3 MB
Table of Contents
Introduction
2
Table of Contents
3
1 Safety Information
5
Installation Conditions
5
Installing the Instrument
5
Power Supply
6
Used Products
6
2 Undertaking and Warranty
6
Liability
6
Warranties
6
Patent
7
3 Components of the Pq Secure System
8
Measuring Device
9
Communication
9
Portable Meter Unilyzer 900 / Unilyzer 900C / Unilyzer 902
9
Software
10
Server Performance
11
4 Installing Permanent Meter Up-2210
12
Location and Fitting
12
Installation Diagram
13
Connection Points
15
Connection Alternatives
18
1-Phase Measurement with Direct Voltage and One CT (Line-To-Neutral Voltage)
18
1-Phase Measurement with One PT and One CT
19
HV 3-Phase Measurement with 2 Ct's and 2 Pt's (Line-To-Line Voltages)
20
HV 3-Phase Measurement with 3 Ct's and 2 Pt's (Line-To-Line Voltages)
21
HV 3-Phase Measurement with 2 Ct's and 3 Pt's (Line-To-Line Voltages)
22
HV 3-Phase Measurement with 3 Ct's and 3 Pt's (Line-To-Line Voltages)
23
3-Phase Measurement with Direct Voltage, 2 Ct´s (Line-To-Neutral)
24
3-Phase Measurement with Direct Voltage, 3 Ct´s and Neutral (Line-To-Neutral Voltages)
25
3-Phase 4 Wire Measurement with 2 Ct's and 2 Pt's
26
Phase with 4 Wire Measurement with 3 Ct's and 2 Pt's
27
Phase with 4 Wire Measurement with 2 Ct's and 3 Pt's
28
Phase with 4 Wire Measurement with 3 Ct's and 3 Pt's
29
Phase with 4 Wire Measurement with Direct Voltage and 2 Ct's
30
Phase with 4 Wire Measurement with Direct Voltage and 3 Ct's
31
Sp 2Ct 2Pt
32
Sp 2Ct DV
33
HV/MV Earth Fault Monitoring Via Channel U4
34
Vector Graph for Correct Connection
35
Recommended Practices
36
Impedance Grounded 3-Wire Systems
36
Effectively (Directly) Grounded 3-Wire Systems
36
Isolated (Ungrounded) 3-Wire Systems
37
Low Voltage 4- or 5-Wire Systems
37
Alternative Connection Option for MV/HV 3-Wire Systems
37
Digital Inputs and Outputs
37
Connection of Digital Inputs
38
Connection of Digital Outputs
38
5 Display Unit
39
6 Installing Communication Equipment
40
Ethernet
40
External Modem
40
Necessary Settings in the Modem
42
Commands
42
Recommended Modem Settings
42
Using Hyperterminal to Configure the Modem
43
Gsm Modem
45
Procedure
47
Wireless Gsm/3G Router
48
Using Multiple Meters with Westermo TD-36 PSTN Modem and RS-485
51
Settings in UP-2210
55
Settings in the Modem
55
Using Multiple Meters with Westermo GDW-11 GSM/GPRS-Modem and RS-485
56
Settings in UP-2210
59
Settings in the Modem
59
Line Divider
59
Configuring the Pentiline PRO
60
7 Gps Clock Synchronisation Module
61
Installation
62
Connecting the GPS to the Display Port
62
Connecting the GPS to the RS-232 Port
62
GPS Communication Configuration
63
Useful Information Regarding Gps
63
8 Installing Software
65
Installation Procedure
65
Installation Program
65
Installing Pq Online
66
Installing Unilauncher
66
Pq Online
68
Connect
68
Measurement Settings
70
Wire-Connection Configuration. Settings Wizard
70
Advanced Settings
76
Real-Time
83
Communication Settings
85
Download Data
86
Tools
87
Language
88
USB Port
88
9 Index
89
Unipower UP2210 Installation And Configuration Manual (87 pages)
Brand:
Unipower
| Category:
Measuring Instruments
| Size: 6 MB
Table of Contents
Introduction
2
Table of Contents
3
1 Safety Information
5
Installation Conditions
5
Installing the Instrument
5
Power Supply
6
Used Products
6
2 Undertaking and Warranty
6
Liability
6
Warranties
6
Patent
7
3 Components of the Pq Secure System
8
Measuring Device
9
Communication
9
Portable Meter Unilyzer 900 / Unilyzer 900C
10
Software
10
Server Performance
11
4 Installing Permanent Meter Up-2210R/P
12
Location and Fitting
12
Installation Diagram
14
Connection Points
14
Connection Alternatives
17
Phase with 4 Wire Measurement with Direct Voltage and 3 Ct's
18
Phase with 4 Wire Measurement with Direct Voltage and 2 Ct's
19
Phase with 4 Wire Measurement with 3 Ct's and 3 Pt's
20
Phase with 4 Wire Measurement with 2 Ct's and 3 Pt's
21
Phase with 4 Wire Measurement with 3 Ct's and 2 Pt's
22
3-Phase 4 Wire Measurement with 2 Ct's and 2 Pt's
23
1-Phase Measurement with Direct Voltage and One CT (Line-To-Neutral Voltage)
24
1-Phase Measurement with One PT and One CT
25
HV 3-Phase Measurement with 2 Ct's and 2 Pt's (Line-To-Line Voltages)
26
HV 3-Phase Measurement with 3 Ct's and 2 Pt's (Line-To-Line Voltages)
27
HV 3-Phase Measurement with 2 Ct's and 3 Pt's (Line-To-Line Voltages)
28
HV 3-Phase Measurement with 3 Ct's and 3 Pt's (Line-To-Line Voltages)
29
3-Phase Measurement with Direct Voltage, 2 Ct´s (Line-To-Neutral)
30
3-Phase Measurement with Direct Voltage, 3 Ct´s and Neutral (Line-To-Neutral Voltages)
31
Split Phase 2CT 2PT
32
Sp 2Ct DV
33
HV/MV Earth Fault Monitoring Via Channel U4
34
Vector Graph for Correct Connection
35
Recommended Practices
36
Impedance Grounded 3-Wire Systems
36
Effectively (Directly) Grounded 3-Wire Systems
36
Isolated (Ungrounded) 3-Wire Systems
37
Low Voltage 4- or 5-Wire Systems
37
Alternative Connection Option for MV/HV 3-Wire Systems
37
Digital Inputs and Outputs
37
Connection of Digital Inputs
38
Connection of Digital Outputs
38
5 Substation Display
39
Pq Online Substation Display Configuration
40
6 Display
41
7 Installing Communication Equipment
42
Ethernet
42
Wireless Gsm/3G Router
42
Using Multiple Meters with Westermo GDW-11 GSM/GPRS-Modem and RS-485
46
8 Gps Clock Synchronisation Module
49
Installation
50
GPS Communication Configuration
50
Irig-B
50
Useful Information Regarding Gps
50
Gps Connection Instruction for Up2210/Up2210R
51
Attaching Several Up2210/Up2210R to the same Gps
55
9 Installing Software
56
Installation Procedure
56
Installation Program
56
Installing Pq Online
57
Installing Unilauncher
57
10 Pq Online
59
Connect
59
Measurement Settings
61
Wire-Connection Configuration. Settings Wizard
61
Advanced Settings
67
Detection Threshold
69
Ripple Frequency
69
Real-Time
75
Communication Settings
77
Download Data
79
Tools
80
Language
81
Usb Port
81
11 Appendix - Comissioning Checklists
82
Meter Installation Checklist
82
Advertisement
Advertisement
Related Products
Unipower UP-2210R
Unipower UP-2210P
Unipower 103-3002 Series
Unipower Combicontrol PIC432B
Unipower SAGEON VIGIL
Unipower Categories
Power Supply
Power distribution unit
Inverter
Battery Charger
Measuring Instruments
More Unipower Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL