Sign In
Upload
Manuals
Brands
Unipower Manuals
Measuring Instruments
UP-2210P
Unipower UP-2210P Manuals
Manuals and User Guides for Unipower UP-2210P. We have
1
Unipower UP-2210P manual available for free PDF download: Installation And Configuration Manual
Unipower UP-2210P Installation And Configuration Manual (87 pages)
Brand:
Unipower
| Category:
Measuring Instruments
| Size: 6.32 MB
Table of Contents
Introduction
2
Table of Contents
3
1 Safety Information
5
Installation Conditions
5
Installing the Instrument
5
Power Supply
6
Used Products
6
2 Undertaking and Warranty
6
Liability
6
Warranties
6
Patent
7
3 Components of the Pq Secure System
8
Measuring Device
9
Communication
9
Portable Meter Unilyzer 900 / Unilyzer 900C
10
Software
10
Server Performance
11
4 Installing Permanent Meter Up-2210R/P
12
Location and Fitting
12
Installation Diagram
14
Connection Points
14
Connection Alternatives
17
Phase with 4 Wire Measurement with Direct Voltage and 3 Ct's
18
Phase with 4 Wire Measurement with Direct Voltage and 2 Ct's
19
Phase with 4 Wire Measurement with 3 Ct's and 3 Pt's
20
Phase with 4 Wire Measurement with 2 Ct's and 3 Pt's
21
Phase with 4 Wire Measurement with 3 Ct's and 2 Pt's
22
3-Phase 4 Wire Measurement with 2 Ct's and 2 Pt's
23
1-Phase Measurement with Direct Voltage and One CT (Line-To-Neutral Voltage)
24
1-Phase Measurement with One PT and One CT
25
HV 3-Phase Measurement with 2 Ct's and 2 Pt's (Line-To-Line Voltages)
26
HV 3-Phase Measurement with 3 Ct's and 2 Pt's (Line-To-Line Voltages)
27
HV 3-Phase Measurement with 2 Ct's and 3 Pt's (Line-To-Line Voltages)
28
HV 3-Phase Measurement with 3 Ct's and 3 Pt's (Line-To-Line Voltages)
29
3-Phase Measurement with Direct Voltage, 2 Ct´s (Line-To-Neutral)
30
3-Phase Measurement with Direct Voltage, 3 Ct´s and Neutral (Line-To-Neutral Voltages)
31
Split Phase 2CT 2PT
32
Sp 2Ct DV
33
HV/MV Earth Fault Monitoring Via Channel U4
34
Vector Graph for Correct Connection
35
Recommended Practices
36
Impedance Grounded 3-Wire Systems
36
Effectively (Directly) Grounded 3-Wire Systems
36
Isolated (Ungrounded) 3-Wire Systems
37
Low Voltage 4- or 5-Wire Systems
37
Alternative Connection Option for MV/HV 3-Wire Systems
37
Digital Inputs and Outputs
37
Connection of Digital Inputs
38
Connection of Digital Outputs
38
5 Substation Display
39
Pq Online Substation Display Configuration
40
6 Display
41
7 Installing Communication Equipment
42
Ethernet
42
Wireless Gsm/3G Router
42
Using Multiple Meters with Westermo GDW-11 GSM/GPRS-Modem and RS-485
46
8 Gps Clock Synchronisation Module
49
Installation
50
GPS Communication Configuration
50
Irig-B
50
Useful Information Regarding Gps
50
Gps Connection Instruction for Up2210/Up2210R
51
Attaching Several Up2210/Up2210R to the same Gps
55
9 Installing Software
56
Installation Procedure
56
Installation Program
56
Installing Pq Online
57
Installing Unilauncher
57
10 Pq Online
59
Connect
59
Measurement Settings
61
Wire-Connection Configuration. Settings Wizard
61
Advanced Settings
67
Detection Threshold
69
Ripple Frequency
69
Real-Time
75
Communication Settings
77
Download Data
79
Tools
80
Language
81
Usb Port
81
11 Appendix - Comissioning Checklists
82
Meter Installation Checklist
82
Advertisement
Advertisement
Related Products
Unipower UP2210
Unipower UP-2210R
Unipower 103-3002 Series
Unipower Combicontrol PIC432B
Unipower SAGEON VIGIL
Unipower Categories
Power Supply
Power distribution unit
Inverter
Battery Charger
Measuring Instruments
More Unipower Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL