Sign In
Upload
Manuals
Brands
SCHUNK Manuals
Industrial Equipment
ROTA-M flex 2+2 400
SCHUNK ROTA-M flex 2+2 400 Manuals
Manuals and User Guides for SCHUNK ROTA-M flex 2+2 400. We have
3
SCHUNK ROTA-M flex 2+2 400 manuals available for free PDF download: Assembly And Operating Manual
SCHUNK ROTA-M flex 2+2 400 Assembly And Operating Manual (61 pages)
Lathe Chuck
Brand:
SCHUNK
| Category:
Industrial Equipment
| Size: 3 MB
Table of Contents
Table of Contents
3
1 General
5
About this Manual
5
Illustration of Safety Notes
5
Applicable Documents
6
Sizes
6
Warranty
6
Scope of Delivery
7
2 Basic Safety Notes
8
Appropriate Use
8
Reasonably Foreseeable Misuse
8
Structural Changes
9
Spare Parts
10
Chuck Jaws
10
Ambient Conditions and Operating Conditions
11
Personnel Qualification
12
Personal Protective Equipment
13
Notes on Safe Operation
13
Transport
14
Malfunctions
14
Disposal
14
Fundamental Dangers
14
Protection During Handling and Assembly
15
Protection During Commissioning and Operation
15
Protection against Dangerous Movements
16
Notes on Particular Risks
16
3 Technical Data
19
Lathe Chuck Data
19
Dimensions
20
Clamping Force RPM Diagrams
24
Calculating the Clamping Force and RPM
27
Calculation of the Required Clamping Force at a Specified Speed of Rotation
27
Calculation Example: Required Initial Clamping Force for a Given RPM
30
Calculation of the Permissible RPM in Case of a Given Initial Clamping Force
31
Accuracy Classes
32
Permissible Imbalance DIN ISO 21940-11
32
4 Screw Tightening Torques
32
5 Assembly
33
Installing and Connecting
33
Testing the Spindle Nose And/Or Machine Table
34
Assembly
35
Assembly of the Lathe Chuck (with Cylindrical Recess)
35
Assembly Preparation for the Lathe Chuck with Reduction or Expansion Adapter Plate
37
Assembly Preparation for the Lathe Chuck with Direct Mounting
38
Assembly Preparation for Lathe Chuck with Base Plate on Machine Table (from Size 800)
38
6 Function
39
Function and Handling
39
Functional Test before Use
39
Replacement or Enlargement of Jaws
40
Clamping the Workpiece
41
Compensation / Workpiece Dimensions
42
Fixed Workpiece Stops and Stop Jaws
43
Assembly of the Fixed Workpiece Stop
43
Assembly of the Locking Cover
44
Possibilities for Clamping Structure Size 800 - 1200
45
7 Maintenance
46
Lubrication
46
Maintenance Intervals
46
Disassembling and Assembling the Chuck
47
Assembling the Lathe Chuck
49
8 Remedies for Faults
52
9 Storage
53
10 Disposal
53
11 Spare Parts
54
12 Drawing
57
13 Declaration of Incorporation
59
14 Appendix On Declaration of Incorporation, as Per 2006/42/EC, Annex II, No. 1 B
60
Advertisement
SCHUNK ROTA-M flex 2+2 400 Assembly And Operating Manual (60 pages)
Brand:
SCHUNK
| Category:
Industrial Equipment
| Size: 5 MB
Table of Contents
Table of Contents
3
General
5
About this Manual
5
Presentation of Warning Labels
5
Applicable Documents
6
Sizes
6
Warranty
6
Scope of Delivery
7
Basic Safety Notes
8
Intended Use
8
Reasonably Foreseeable Misuse
8
Constructional Changes
9
Spare Parts
10
Chuck Jaws
10
Environmental and Operating Conditions
11
Personnel Qualification
12
Personal Protective Equipment
13
Notes on Safe Operation
13
Transport
14
Malfunctions
14
Disposal
14
Fundamental Dangers
14
Protection During Handling and Assembly
15
Protection During Commissioning and Operation
15
Protection against Dangerous Movements
16
Notes on Particular Risks
16
Technical Data
19
Lathe Chuck Data
19
Dimensions
20
Clamping Force / Speed Diagrams
24
Calculations for Clamping Force and Speed
28
Calculation of the Required Clamping Force in Case of a Given Rpm
28
Calculation Example: Required Initial Clamping Force for a Given Speed
31
Calculation of the Permissible Speed in Case of a Given Initial Clamping Force
32
Grades of Accuracy
33
Permissible Imbalance DIN ISO 21940-11
33
Torques Per Screw
33
Assembly
34
Installing and Connecting
34
Testing the Spindle Nose And/Or Machine Table
35
Assembly
36
Assembly of the Lathe Chuck (with Cylindrical Recess)
36
Assembly Preparation for Lathe Chuck with Reduction or Expansion Adapter Plate
38
Assembly Preparation for Lathe Chuck with Direct Mounting
39
Assembly Preparation for Lathe Chuck with Base Plate on Machine Table (ML Lathe Chuck Only)
39
Function
40
Function and Handling
40
Function Test before Use
40
Replacement or Renewal of Jaws
41
Clamping the Workpiece
42
Compensation / Workpiece Dimensions
43
Fixed Workpiece Stops and Stop Jaws
44
Assembly of the Fixed Workpiece Stop
44
Locking Cover
45
Assembly of the Locking Cover
45
Possibilities for Clamping Structure
46
Size 260 - 1200
46
Possibilities for Clamping Structure Size ML 630 - ML 1200
47
Maintenance
48
Lubrication
48
Maintenance Intervals
48
Disassembling and Assembling the Chuck
49
Assembling the Lathe Chuck
51
Remedies for Faults
54
Storage
55
Disposal
55
Spare Parts
56
Drawing
59
SCHUNK ROTA-M flex 2+2 400 Assembly And Operating Manual (51 pages)
Lathe Chucks
Brand:
SCHUNK
| Category:
Industrial Equipment
| Size: 3 MB
Table of Contents
Table of Contents
3
1 General
5
About this Manual
5
Presentation of Warning Labels
5
Applicable Documents
6
Sizes
6
Warranty
6
Scope of Delivery
6
2 Basic Safety Notes
7
Intended Use
7
Reasonably Foreseeable Misuse
7
Constructional Changes
8
Spare Parts
9
Chuck Jaws
9
Environmental and Operating Conditions
10
Personnel Qualification
11
Personal Protective Equipment
12
Notes on Safe Operation
12
Transport
13
Malfunctions
13
Disposal
13
Fundamental Dangers
14
Protection During Handling and Assembly
14
Protection During Commissioning and Operation
14
Protection against Dangerous Movements
15
Notes on Particular Risks
15
3 Technical Data
18
Lathe Chuck Data
18
Dimensions
19
Clamping Force / Speed Diagrams
21
Calculations for Clamping Force and Speed
23
Calculation of the Required Clamping Force in Case of a Given Rpm
23
Calculation Example: Required Initial Clamping Force for a Given Speed
26
Calculation of the Permissible Speed in Case of a Given Initial Clamping Force
27
Grades of Accuracy
28
Permissible Imbalance DIN ISO 21940-11
28
4 Torques Per Screw
28
5 Assembly
29
Installing and Connecting
29
Testing the Spindle Nose
30
Assembly
30
Assembly of the Lathe Chuck (with Cylindrical Recess)
31
Assembly Preparation for Lathe Chuck with Reduction or Expansion Adapter Plate
32
Assembly Preparation for Lathe Chuck with Direct Mounting
33
6 Function
34
Function and Handling
34
Function Test before Use
34
Replacement or Renewal of Jaws
35
Clamping the Workpiece
36
Compensation / Workpiece Dimensions
37
7 Maintenance
38
Lubrication
38
Maintenance Intervals
38
Disassembling and Assembling the Chuck
38
Assembling the Lathe Chuck
40
8 Remedies for Faults
43
9 Storage
45
10 Disposal
45
11 Spare Parts
46
12 Drawing
48
13 Translation of the Original Declaration of Incorporation
49
14 Appendix On Declaration of Incorporation, as Per 2006/42/EC, Annex II, No. 1 B
50
Advertisement
Advertisement
Related Products
SCHUNK KGG 220-high-temperature V/HT
SCHUNK ROTA-M flex 2+2 260
SCHUNK ROTA-M flex 2+2 315
SCHUNK ROTA-M flex 2+2 500
SCHUNK ROTA-M flex 2+2 630
SCHUNK ROTA-M flex 2+2 800
SCHUNK ROTA-M flex 2+2 1000
SCHUNK ROTA-M flex 2+2 1200
SCHUNK 28-AS
SCHUNK ROTA-G 200-62
SCHUNK Categories
Industrial Equipment
Power Tool
Control Unit
Accessories
Tools
More SCHUNK Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL