Sign In
Upload
Manuals
Brands
SCHUNK Manuals
Industrial Equipment
ROTA-M flex 2+2 1200
SCHUNK ROTA-M flex 2+2 1200 Manuals
Manuals and User Guides for SCHUNK ROTA-M flex 2+2 1200. We have
3
SCHUNK ROTA-M flex 2+2 1200 manuals available for free PDF download: Assembly And Operating Manual
SCHUNK ROTA-M flex 2+2 1200 Assembly And Operating Manual (61 pages)
Lathe Chuck
Brand:
SCHUNK
| Category:
Industrial Equipment
| Size: 3 MB
Table of Contents
Table of Contents
3
1 General
5
About this Manual
5
Illustration of Safety Notes
5
Applicable Documents
6
Sizes
6
Warranty
6
Scope of Delivery
7
2 Basic Safety Notes
8
Appropriate Use
8
Reasonably Foreseeable Misuse
8
Structural Changes
9
Spare Parts
10
Chuck Jaws
10
Ambient Conditions and Operating Conditions
11
Personnel Qualification
12
Personal Protective Equipment
13
Notes on Safe Operation
13
Transport
14
Malfunctions
14
Disposal
14
Fundamental Dangers
14
Protection During Handling and Assembly
15
Protection During Commissioning and Operation
15
Protection against Dangerous Movements
16
Notes on Particular Risks
16
3 Technical Data
19
Lathe Chuck Data
19
Dimensions
20
Clamping Force RPM Diagrams
24
Calculating the Clamping Force and RPM
27
Calculation of the Required Clamping Force at a Specified Speed of Rotation
27
Calculation Example: Required Initial Clamping Force for a Given RPM
30
Calculation of the Permissible RPM in Case of a Given Initial Clamping Force
31
Accuracy Classes
32
Permissible Imbalance DIN ISO 21940-11
32
4 Screw Tightening Torques
32
5 Assembly
33
Installing and Connecting
33
Testing the Spindle Nose And/Or Machine Table
34
Assembly
35
Assembly of the Lathe Chuck (with Cylindrical Recess)
35
Assembly Preparation for the Lathe Chuck with Reduction or Expansion Adapter Plate
37
Assembly Preparation for the Lathe Chuck with Direct Mounting
38
Assembly Preparation for Lathe Chuck with Base Plate on Machine Table (from Size 800)
38
6 Function
39
Function and Handling
39
Functional Test before Use
39
Replacement or Enlargement of Jaws
40
Clamping the Workpiece
41
Compensation / Workpiece Dimensions
42
Fixed Workpiece Stops and Stop Jaws
43
Assembly of the Fixed Workpiece Stop
43
Assembly of the Locking Cover
44
Possibilities for Clamping Structure Size 800 - 1200
45
7 Maintenance
46
Lubrication
46
Maintenance Intervals
46
Disassembling and Assembling the Chuck
47
Assembling the Lathe Chuck
49
8 Remedies for Faults
52
9 Storage
53
10 Disposal
53
11 Spare Parts
54
12 Drawing
57
13 Declaration of Incorporation
59
14 Appendix On Declaration of Incorporation, as Per 2006/42/EC, Annex II, No. 1 B
60
Advertisement
SCHUNK ROTA-M flex 2+2 1200 Assembly And Operating Manual (60 pages)
Brand:
SCHUNK
| Category:
Industrial Equipment
| Size: 5 MB
Table of Contents
Table of Contents
3
General
5
About this Manual
5
Presentation of Warning Labels
5
Applicable Documents
6
Sizes
6
Warranty
6
Scope of Delivery
7
Basic Safety Notes
8
Intended Use
8
Reasonably Foreseeable Misuse
8
Constructional Changes
9
Spare Parts
10
Chuck Jaws
10
Environmental and Operating Conditions
11
Personnel Qualification
12
Personal Protective Equipment
13
Notes on Safe Operation
13
Transport
14
Malfunctions
14
Disposal
14
Fundamental Dangers
14
Protection During Handling and Assembly
15
Protection During Commissioning and Operation
15
Protection against Dangerous Movements
16
Notes on Particular Risks
16
Technical Data
19
Lathe Chuck Data
19
Dimensions
20
Clamping Force / Speed Diagrams
24
Calculations for Clamping Force and Speed
28
Calculation of the Required Clamping Force in Case of a Given Rpm
28
Calculation Example: Required Initial Clamping Force for a Given Speed
31
Calculation of the Permissible Speed in Case of a Given Initial Clamping Force
32
Grades of Accuracy
33
Permissible Imbalance DIN ISO 21940-11
33
Torques Per Screw
33
Assembly
34
Installing and Connecting
34
Testing the Spindle Nose And/Or Machine Table
35
Assembly
36
Assembly of the Lathe Chuck (with Cylindrical Recess)
36
Assembly Preparation for Lathe Chuck with Reduction or Expansion Adapter Plate
38
Assembly Preparation for Lathe Chuck with Direct Mounting
39
Assembly Preparation for Lathe Chuck with Base Plate on Machine Table (ML Lathe Chuck Only)
39
Function
40
Function and Handling
40
Function Test before Use
40
Replacement or Renewal of Jaws
41
Clamping the Workpiece
42
Compensation / Workpiece Dimensions
43
Fixed Workpiece Stops and Stop Jaws
44
Assembly of the Fixed Workpiece Stop
44
Locking Cover
45
Assembly of the Locking Cover
45
Possibilities for Clamping Structure
46
Size 260 - 1200
46
Possibilities for Clamping Structure Size ML 630 - ML 1200
47
Maintenance
48
Lubrication
48
Maintenance Intervals
48
Disassembling and Assembling the Chuck
49
Assembling the Lathe Chuck
51
Remedies for Faults
54
Storage
55
Disposal
55
Spare Parts
56
Drawing
59
SCHUNK ROTA-M flex 2+2 1200 Assembly And Operating Manual (56 pages)
Manual Lathe Chuck
Brand:
SCHUNK
| Category:
Industrial Equipment
| Size: 64 MB
Table of Contents
Table of Contents
3
General
5
About this Manual
5
Illustration of Warnings
5
Applicable Documents
5
Warranty
6
Sizes
6
Scope of Delivery
6
Basic Safety Notes
7
Appropriate Use
7
Inappropriate Use
7
Structural Changes
8
Spare Parts
8
Ambient Conditions and Operating Conditions
8
Material Limitations
9
Chuck Jaws
9
Personnel Qualifications
9
Personal Protective Equipment
10
Transport
10
Protection During Handling and Assembly
10
Protection During Commissioning and Operation
10
Notes on Safe Operation
11
Disposal
13
Fundamental Dangers
13
Protection against Dangerous Movements
13
Notes on Particular Risks
14
Technical Data
17
Lathe Chuck Data
17
Dimensions
18
Clamping Force / Speed Diagrams
21
Calculations for Clamping Force and Speed
24
Calculation of the Required Clamping Force in Case of a Given Rpm
25
Calculation Example: Required Initial Clamping Force for a Given Speed
27
Calculation of the Permissible Speed in Case of a Given Initial Clamping Force
28
Grades of Accuracy
28
Permissible Imbalance DIN ISO 21940-11
28
Assembly
29
Torques Per Screw
29
Mounting in General
29
Pre-Assembly Measures
29
Chuck Assembly Options
30
Installing and Connecting
31
Assembly of the Lathe Chuck (with Cylindrical Recess)
31
Assembly Preparation for Lathe Chuck with Reduction or Expansion Adapter Plate
32
Assembly Preparation for Lathe Chuck with Direct Mounting
32
Assembly Preparation for Lathe Chuck with Base Plate on Machine Table (ML Lathe Chuck Only)
32
Function
33
Function and Handling
33
Function Test before Use
33
Replacement or Renewal of Jaws
34
Clamping the Workpiece
34
Compensation / Workpiece Dimensions
35
Fixed Workpiece Stops and Stop Jaws
36
Assembly of the Fixed Workpiece Stop
36
Locking Cover
36
Assembly of the Locking Cover
37
Possibilities for Clamping Structure (Only ROTA-ML Flex 2+2)
38
Maintenance
39
Lubrication
39
Maintenance and Lubrication Plan
40
Disassembling and Assembling the Chuck
40
Assembling the Lathe Chuck
42
Remedies for Faults
45
Storage
46
Disposal
47
Spare Parts
48
Drawing
50
Advertisement
Advertisement
Related Products
SCHUNK ROTA-M flex 2+2 1000
SCHUNK KGG 220-high-temperature V/HT
SCHUNK ROTA-M flex 2+2 260
SCHUNK ROTA-M flex 2+2 315
SCHUNK ROTA-M flex 2+2 400
SCHUNK ROTA-M flex 2+2 500
SCHUNK ROTA-M flex 2+2 630
SCHUNK ROTA-M flex 2+2 800
SCHUNK 28-AS
SCHUNK ROTA-G 200-62
SCHUNK Categories
Industrial Equipment
Power Tool
Control Unit
Accessories
Tools
More SCHUNK Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL