Sign In
Upload
Manuals
Brands
Dynapac Manuals
Construction Equipment
DTR75
Dynapac DTR75 Manuals
Manuals and User Guides for Dynapac DTR75. We have
1
Dynapac DTR75 manual available for free PDF download: Operating Instruction
Dynapac DTR75 Operating Instruction (120 pages)
Double vibratory roller
Brand:
Dynapac
| Category:
Construction Equipment
| Size: 33 MB
Table of Contents
Table of Contents
3
1 Introduction
7
Foreword
8
Machine Type Plate and Engine Type Plate
10
2 Technical Data
11
Noise and Vibration Data
14
Noise Data
14
Vibration Data
14
3 Concerning Your Safety
15
Basic Prerequisites
16
General
16
Explanation of Signal Words Used
16
Personal Protective Equipment
17
Intended Use
18
Improper Use
18
Definition of Responsible Persons
20
Operating Company
20
Expert / Qualified Person
20
Driver / Operator
20
Basic Safety Regulations for Safe Operation
22
Remaining Dangers, Remaining Risks
22
Regular Safety Inspections
22
Modifications and Alterations to the Machine
22
Damage, Defects, Misuse of Safety Devices
22
Handling Fuels and Lubricants
23
Preliminary Remarks
23
Safety Regulations and Environmental Protection Regulations for Handling Diesel Fuel
24
Safety Regulations and Environmental Protection Regulations for Handling Oil
25
Safety Regulations and Environmental Protection Regulations for Handling Hydraulic Oil
26
Safety Regulations and Environmental Protection Regulations for Handling Battery Acid
27
Safety Regulations and Environmental Protection Regulations When Handling Lubrication Grease
28
Loading / Transporting the Machine
29
Start-Up Procedure
30
Prior to Starting up
30
Starting the Engine
30
Operation
31
Persons in the Danger Area
31
Driving up and down Slopes
31
Working with Vibration
31
Parking the Machine
32
Refuelling
33
Emergency Procedures
34
Maintenance Work
35
Preliminary Remarks
35
Working on Hydraulic Lines
35
Working on the Engine
35
Maintenance Work on Electric Components and Battery
36
Cleaning Work
36
After Maintenance Work
36
Repair
37
Signage
38
4 Indicators and Control Elements
43
Machine
44
Travel Lever
44
Throttle Lever
44
Vibration Lever
44
Reversing Protection
45
Parking Brake Lever
45
Starter Switch
45
Steering Rod Locking Bolt
46
Height Adjustment
46
Water Spraying System
46
Engine
47
Decompression Lever
47
Crank Handle
47
5 Checks Prior to Start up
49
Notes on Safety
50
Visual Inspections and Function Tests
51
Checking the Engine Oil Level
52
Checking the Fuel Level; Topping up Fuel
53
Checking the Hydraulic Oil Level
54
Checking the Rubber Buffers
55
Checking the Water Level, Topping up
56
6 Operation
57
Adjusting the Steering Rod
58
Starting the Engine
59
Travel Operation
61
Operation
63
Preliminary Remarks and Safety Notes
63
Working with Vibration
63
Water Spraying System
66
Parking the Machine in Secured Condition
67
7 Loading / Transporting the Machine
69
Loading the Machine
70
Lashing the Machine to the Transport Vehicle
71
Loading by Crane
72
After Transport
73
8 Maintenance
75
Preliminary Remarks and Safety Notes
76
Preparations/Concluding Work
77
Opening the Protection Hood
77
Fuels and Lubricants
78
Engine Oil
78
Fuel
78
Mineral Oil Based Hydraulic Oil
79
Lubrication Grease
79
List of Fuels and Lubricants
80
Running-In Instructions
81
General
81
After 25 Operating Hours
81
Maintenance Table
82
Weekly
83
Checking, Cleaning the Air Filter
83
Checking, Cleaning the Water Separator
84
Semi-Annually
86
Battery Service
86
Servicing the V-Belt
87
Servicing the Toothed Belt
87
Greasing the Gears
88
Annually
90
Checking, Adjusting the Valve Clearance
90
Changing Engine Oil and Oil Filter Element
92
Replacing the Fuel Filter
93
Replacing the V-Belt
95
Replacing the Toothed Belt
95
Replacing the Air Filter
97
Cleaning the Crank Handle Guide
97
Checking the Hydraulic Lines
98
Every 2 Years
99
Changing Hydraulic Oil and Hydraulic Oil Filter
99
As Required
101
Cleaning the Water Spraying System
101
Adjusting the Scrapers
102
Cleaning the Machine
103
Cleaning the Cooling Fins and the Cooling Air Intake Openings
103
Bleeding the Fuel System
104
Measures if There Is a Risk of Frost
105
Measures Prior to Extended Shut-Down Period
105
9 Troubleshooting
109
Preliminary Remarks
110
Emergency Starting with Crank Handle
111
Starting the Engine with Jump Leads
114
Engine Malfunctions
115
Advertisement
Advertisement
Related Products
Dynapac D.ONE
Dynapac DTR100
Dynapac Svedala Demag DF 115 P/D
Dynapac Svedala Demag DF 125 P/D
Dynapac DTR75D
Dynapac DR7
Dynapac DF 145 P
Dynapac SVEDALA DEMAG DF 65 C
Dynapac REDLINE DRA90
Dynapac REDLINE DRA30
Dynapac Categories
Construction Equipment
Power Tool
Finishers
Planer
Industrial Equipment
More Dynapac Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL