Martin VENT-FREE FIREPLACE SYSTEMS 33ISDG Installation And Operating Instructions Manual page 12

Vent-free fireplace systems
Table of Contents

Advertisement

CLEARANCES and HEIGHT REQUIREMENTS
Figure 7 - Measuring Heat Resistant
Material for Mantel
No combustible materials
within 8" of opening.
Do not cover louvers.
Figure 9 - Unsafe Mantel Clearance
12
No combustible materials
within 8" of opening.
Do not cover louvers.
Hood
8"
6"
1
2
/
"
2
4"
Hood
HEAT RESISTANT MATERIAL (MINIMUM REQUIRE-
MENTS) WITH NO WOODEN MANTEL OR OTHER COM-
BUSTIBLE PROJECTION
Heat resistant material (minimum requirements) with wooden mantel
or other combustible projection:
To install the heater with a wooden mantel shelf or other combustible
projection above, first measure the heat resistant material shown in
Figure 7.
12"
10"
8"
6"
/
"
2
1
2
Figure 8 - Minimum Mantel Clearance
Figure 9 is an example of an unsafe mantel installation. The
mantel projects 4" at 8" above the opening, exceeding the maxi-
mum acceptable distance of 2
at 10" above the opening, exceeding the maximum acceptable
distance of 6".
If your mantel profile is unsafe, you may either:
• Raise the mantel to an acceptable height or,
• Remove the mantel.
8"
26"
Example: A mantel
14"
may project from the
wall a maximum of
10"
1
2
/
" at minimum of 8"
8"
2
above the opening, and
a maximum of 12" at a
minimum of 26" above
the opening.
1
/
". The mantel also projects 8"
2
23D8036

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents