3 Server installation
1.
With the outer slide rails extended a short distance from the rack,
insert the inner slide rails (with the server attached) into the outer
slide rails, as shown 1. Press the inner slide lock 2, and then push
the server all the way into the rack, making sure that the inner slide
rails lock into place.
1
2.
Slide the server in and out of the rack several times, allowing the
rails to position properly 1.
3.
Lock the server in place using the thumbscrews 2.
2
1
4.
If installing a hardware-mounted rail assembly, tighten all the slide
rail screws.
2
5203A
5204
5205
4 Cables
1.
Install the cables.
2.
Plug the power cord into the rack power strip.