- The illuminated ring shows a green colour, if the boiler starts
correctly.
- Instruct the customer in the operation of the boiler. Complete
the commissioning report and hand over the instructions to
the customer.
Saving energy
- Instruct the customer about energy-saving options.
- Refer your customer to section „Information regarding
energy-efficient operation" in the operating instruc-
tions.
Setting the BUS address (only for MM with SCOM interface or cascade)
When operating several boilers (number of boilers >1) in conjunction with a cascade module, set the eBUS address of each boiler
in accordance with the table below.
BUS address setting:
Hold down the reset button; after 5 seconds, the corresponding flashing code will be displayed (see table). Select the corresponding
address with the DHW temperature rotary selector. Release the reset button again.
BUS address
1
2
3
4
5
0
3061344_201509

Commissioning

DHW rotary selector position
1
2
3
4
5
6
Illuminated ring
Fig.: Control unit overview
Illuminated ring display
flashing red
flashing yellow
flashing yellow/red
flashing yellow/green
flashing green/red
flashing green (factory setting)
25