4-3.
GEAR (LOMINI)/(LOAD CAM) ASSY
gear (LOAD 2)
marking
Fig. A
3 Attach the gear (LOAD CAM) assy
with its facing inside.
4-4.
OPERATION CHECK
1 Confirm that the slider moves in the direction of arrow C to move down
the chuck plate if the gear (LOAD CAM) is rotated in the direction of arrow
A or the chuck plate moves up and the slider moves in the direction of
arrow D if the gear is rotated in the direction of arrow B .
gear (LOMINI)
chuck plate
slit
chuck plate
A
gear (LOAD CAM) assy
2 Attach the gear (LOMINI) at the position
shown in Fig. A.
shaft (rotary prevention C)
1 Move the lever (LOCK 3A)
B
4 stop ring 1.5 (E type)
slider
D
C
B
CDX-602
fully in the direction of arrow B
to move the chuck plate up.
13