Fuselage Part II (cont)
4. Set the hatch on the fuselage
and verify the fit, basically you
have to hold the hatch in place
until the 5 minute epoxy is cured
enough to hold the bulkhead in
position. Repeat steps 3 and 4
with the front bulkhead.
5. Once the 5 minute epoxy has
dried use slow cure epoxy and a
structural filler to create a fillet
on each bulkhead. You can also
glue in a eyebolt for a rubber
band to retain the hatch.
Construction
6. A Skymelody variometer in-
stallation is shown here as an ex-
ample of how to mount a
variometer. In this installation a
fuselage mounted total energy
probe is being used.
7. Since there are so many bat-
tery , switch, and receivers being
used, it is left up to you to decide
how you would like to mount
yours.
Time to go fly!
Page 20
Super XC