INSTALLATION CONSIDERATIONS
solvent cemented to a length of pipe connecting the two
couplings. The length of pipe should be the wall thickness
plus the depth of the socket fittings to be installed on the
inside and outside of the wall. The wall penetration should
be sealed with silicone caulking material.
12" MIN.
Horizontal Termination (Single Pipe)
Above Highest Anticipated Snow Level
10"- 24"
6" MAX
4" MIN
90º OR 45°
ELBOW
Standard Horizontal Terminations (Dual Pipe)
ELBOWS
3" - 24"
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
Alternate Horizontal Vent Termination (Dual Pipe)
VENT/FLUE TEE (
OPTIONAL)
or
45° ELBOW
TURNED DOWN or
90° ELBOW TURNED
DOWN
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
12" MIN. TO GRADE OR
HIGHEST ANTICIPATED
SNOW LEVEL
90°
ELBOWS
Combustion Air Intake may also be snorkeled to obtain 12" min ground
clearance.
Alternate Vent Termination Above Anticipated Snow Level
(Dual Pipe)
12" MINIMUM
90% Furnace Horizontal Termination (Single Pipe)
Above Highest Anticipated Snow Level
In a basement installation, the vent/flue pipe can be run be-
tween joist spaces. If the vent pipe must go below a joist
and then up into the last joist space to penetrate the header,
two 45° elbows should be used to reach the header rather
than two 90° elbows.
Direct Vent (Dual Pipe) Piping
Direct vent installations require both a combustion air in-
take and a vent/flue pipe. The pipes may be run horizontally
and exit through the side of the building or run vertically and
90°
3"-24" BETWEEN PIPES
12" MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
VENT/FLUE TEE
OR
90° ELBOW TURNED
DOWN
12" MINIMUM ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
23