Manitowoc Chiplet QC0700 Installation, Use & Care Manual page 29

Flake / chiplet model
Hide thumbs Also See for Chiplet QC0700:
Table of Contents

Advertisement

Section 2
Suction Shut Off Valve Insulation
The pre-formed suction shut-off valve insulation is
located in the plastic bag taped to the water curtain.
A. Verify valve and schrader caps are tightened to
specifications (see Step 6).
TIGHTEN VALVE CAPS
TO SPECIFICATIONS
B. Place insulation over schrader valve cap and left
side of valve. Position the tab between the
mounting bracket and rear panel.
C. Fold insulation and hold against right hand side
of valve while securing with electrical tape. Seal
the line set insulation to the shut off valve
insulation with electrical tape.
Part Number 000002688
PRE-FORMED
INSULATION
SV3084
PLACE TAB BETWEEN
VALVE BODY AND PANEL
SV3085
FOLD INSULATION OVER
RIGHT SIDE OF VALVE AND
SECURE WITH
ELECTRICAL TAPE
SV3086
Installation Instructions
2-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rfc2385Qf0800Qf0400Qf2300

Table of Contents