Install Leveling Legs; Make Gas Connection - Maytag YMEDB725CG0 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALL
LEVELING
LEGS
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.
_,
Prepare dryer for ievelin 9 legs
To avoid damaging floor, use a large flat piece of cardboard
from dryer carton; place under entire dryer. Firmly grasp
dryer body (not console panel) and gently lay dryer down
on cardboard.
IMPORTANT." If laying dryer on its back, use the cardboard
corner posts the dryer was packed with to avoid damaging
the back of the dryer. Lay the dryer on its side if you do not
have the cardboard corner posts the dryer was packed with.
2,
Screw in leveling
.J
..........
Flange
Models with riser
legs
i
Models with riser:
Using a wrench, screw legs into cabinet until foot flange
touches the riser. Foot is fully installed when bottom of foot
is approximately
1/2" (13 mm) from bottom of the riser.
Models without riser:
Using a wrench and tape measure, screw legs into leg holes
until bottom of foot is approximately
13/8 '' (35 mm) from
bottom of dryer.
Now stand the dryer on its legs. Slide the dryer until it is
close to its final location. Leave enough room for electrical
connection
and to connect the exhaust vent.
NOTE: Refer to Dryer Dimensions in the Location
Requirements.
MAKE
GAS CONNECTION
"1,
Connect
gas supply
to dryer
Flared
male fitting
Non-flared
male fitting
Remove red cap from gas pipe. Using a wrench to tighten,
connect gas supply to dryer. Use pipe-joint compound
on threads of all non-flared male fittings. If flexible metal
tubing is used, be sure there are no kinks.
NOTE: For LP gas connections,
you must use pipe-joint
compound
resistant to action of LP gas. Do not use
TEFLON _*>t tape.
2,
Plan pipe fitting
connection
I
A combination
of pipe fittings must be used to connect dryer
to existing gas line. A recommended
connection is shown.
Your connection may be different, according to supply line
type, size, and location.
3.
Open shut-off
valve
Closed_
Open valve
Open shut-off valve in supply line; valve is open when handle
is parallel to gas pipe. Then, test all connections
by brushing
on an approved noncorrosive
leak-detection
solution.
Bubbles will show a leak. Correct any leaks found.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents