Creating A "Internal Wall" Flue Installation - Rinnai RHFE-750ETR Installation Manual

Power flued flamefire space heater co-axial flue system
Hide thumbs Also See for RHFE-750ETR:
Table of Contents

Advertisement

CREATING A "INTERNAL WALL" FLUE INSTALLATION

Total flue length can be up to 6.5 metres long and can
y
contain a maximum of one (1) ESBEND (1 x 90°)!
b
a
e
Follow steps 1 through 5 from the chapter "Heater Installation" in the "Rinnai ASPIRATION Operation / Installation
Manual" supplied with the heater.
The Internal-Wall vertical flue installation is installed against an internal wall within a false fire place or other
suitable cavity and is run vertically upwards to the termination point. When considering the location of the heater
due care must be taken to ensure that the flue path in the roof space are free of obstructions such as studs,
noggins, joists, braces, and electricals etc.
To prevent accidental or erroneous dislodgement, the joints between transition assembly (flue
transition and condensate trap assembly) and ESPIPE900 components MUST BE clipped to the
CAUTION
wall using the stand off clips supplied or other suitable method.
Steps for creating a Internal Wall flue installation are as follows:
1
2.
Use the section "WALL PENETRATIONS" on page 6 to determine the vertical and horizontal location of the
heater's flue exhaust outlet and mount the assembled ASPKIT03 components in this location in an upwards
vertical manner.
3. Fit lengths of ESPIPE900 to ASPKIT03 in accordance with "COMPONENT ASSEMBLY & CONNECTION ~
ESPIPE900" on page 17. Determine the location of roof and or ceiling penetration points. To avoid obstructions
in the flue path a horizontal offset can be created using ESBEND.
4. Create a vertical roof terminal in accordance with "CUTTING ~ ASPDFK, ESPIPE900 & ESROOFCOWL" on
page 17 and assemble and connect in accordance with "COMPONENT ASSEMBLY & CONNECTION ~
ESROOFCOWL" on page 19.
5. Move the heater into place and make the heater exhaust and combustion air hose connections in accordance
with the section "CONNECTING HEATER EXHAUST & AIR SUPPLY" on page 20.
Air hose and heater exhaust connections at the heater MUST be made and checked in accordance
with these instructions. Improper connections may result in dangerous situations, for example, the
CAUTION
dispersion of combustion products in the space being heated.
6. Connect condensate drain tube to heater in accordance with the instructions on page 21.
7. Follow steps 6 through 11 from the chapter "Heater Installation" in the "Rinnai ASPIRATION Operation /
Installation Manual" supplied with the heater and complete the installation and commissioning of the heater in
accordance with these.
Rinnai Australia
FLUE COMPONENT ASSEMBLY
c
d
c
1. Assemble the Flue Adaption Kit 750 (ASPKIT03) joining the flue transition and the
condensate components together in accordance with "COMPONENT ASSEMBLY &
CONNECTION ~ ESCONDK" on page 19.
The joints between the flue transition and condensate trap MUST BE
secured by a pop rivet or screw through the outer co-ax pipes to prevent
CAUTION
accidental or erroneous dislodgement.
The assembled ASPKIT03 is to be clipped using the stand off clips supplied
or other suitable method.
ASPKIT03 components and ESPIPE900 DO NOT require cutting to be joined.
Activities for creating an Internal Wall flue installation:
a.
Assemble Flue Adaption Kit 750 (ASPKIT03).
b.
Locate, Fit & Secure ASPKIT03 components.
c.
Locate Heater.
d.
Connect Heater Exhaust.
e.
Connect Combustion Air Hose.
y.
Refer to steps j. - l. of Creating an External Wall
Flue Installation (As Required).
z.
Finalise Installation & Commissioning Of Heater.
12
CAUTION
?
CAUTION
ASP Flue Installation Manual