1.7 Installation Procedure
The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the NCN LSWE
boiler in its final location. A detailed description is given of the procedure in the sequenced sections below:
Wall-mounting
Water and condensate
pipe connection
Gas connection
DIP switch settings
Electrical connections
»
p. 20
»
p. 23
»
p. 27
»
p. 36
»
p. 37
Final check
»
p. 40
Gas changeover
(if necessary)
»
p. 51
Flue gases exhaustion
system installation
(if necessary)
»
p. 30
Boiler operation
»
p. 41
About the Boiler
19