3. Installing the Boiler
3.1 Installation Procedure
The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the LCB700
boiler in its final location. A detailed description is given of the procedure in the sequenced sections below:
Installation Location
»
p. 18
Water and condensate
pipe connections
»
p. 20
Oil connection
»
p. 28
DIP switch settings
»
p. 38
Electrical connections
»
p. 41
Final check
»
p. 50
Boiler operation
»
p. 52
Installing the Boiler
17