Torque Fitness TQ5-001 Assembly And Maintenance Manual page 25

Hybrid strength technology gym system
Table of Contents

Advertisement

STEP 20
Route the ball end of WEIGHT STACK CABLE
(64) through the hole in the BASE (2) around
64
the two 4-1/2" PULLEYS in the BASE (2)
before looping the CABLE around the 3-1/2"
SINGLE FLOATING PULLEY (36) as shown.
Route the ball end of WEIGHT STACK CABLE
(64) thru the hole in the plate on the BASE (2)
and assemble one CABLE END SLEEVE (58)
to the WEIGHT STACK CABLE (64) as shown.
36
NOTE: Make sure the cable runs in the
groove of the pulleys and to the inside of
the cable retaining brackets.
58
2
64
1
2
3
4
5
6
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Torque Fitness TQ5-001

Table of Contents