Alpha InTec2 26CE Installation And Servicing Instructions page 35

Wall mounted, fan assisted, room sealed, gas fired, high efficiency condensing combination boiler
Table of Contents

Advertisement

4.
Refill, vent and re-pressurise the system as necessary. (Refer to Commissioning, Section 5.1).
If the system pressure exceeds 2.5 bar when operating at maximum temperature, the heating expansion vessel should
be checked and re-pressurised, if necessary.
Note: 1. Check the expansion vessel charge only when the system pressure is zero.
2. The expansion vessel pressure test point is accessible from on top at the top left side.
5.
Check that the condensate trap drain pipe is connected and all joints are sound.
6.
Check the air flow through the heat exchanger as described in Section 5.4.
7.
Record details of the service in the Service Record at the back of these instructions.
6.2
CASING REMOVAL - Figs. 6.1, 6.2, 6.3 and 6.4
To facilitate boiler servicing and maintenance the casing can be completely removed as follows:
Control panel cover - Fig. 6.1
1.
Hinge down the control panel door, remove the
two screw cover plugs 'A' and remove the screws
'B'.
2.
Pull the front panel 'C' towards you and release it
from its lower fixing.
Case front panel - Fig. 6.2
3.
Loosen the two screws 'D'.
4.
Pull the front panel 'E' slightly towards you.
5.
Release front 'E' from pins 'F' pulling it towards
you while pushing it upwards at the same time.
1
B
A
1
A
5
F
4
3
D
E
Alpha InTec² 26E, 30CE and 35CE - Routine Servicing
B
Fig. 6.1
5
F
4
3
D
Fig. 6.2
2
35

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the InTec2 26CE and is the answer not in the manual?

This manual is also suitable for:

Intec2 35ceIntec2 30ce

Table of Contents