Counterbalance Manifold Service - Toro Groundsmaster 4000-D Service Manual

Hide thumbs Also See for Groundsmaster 4000-D:
Table of Contents

Advertisement

Counterbalance Manifold Service

35 to 40 ft- -lb
(47 to 54 N- -m)
1
1. Manifold body
2. Pilot valve
NOTE: The ports on the manifold are marked for easy
identification of components. Example: C1 is the con-
nection port from the LH deck lift cylinder and CHG is the
charge circuit connection (See Hydraulic Schematic in
Chapter 9 -- Foldout Drawings to identify the function of
the hydraulic lines and cartridge valves at each port).
Hydraulic System
3
5
3. Seal kit
4. Relief valve (counterbalance)
2
Figure 97
Counterbalance Manifold Service (Fig. 97)
For cartridge valve service procedures, see 4WD Man-
ifold Service in this section. Refer to Figure 97 for coun-
terbalance manifold cartridge valve installation torque.
Page 4 - - 140
35 to 40 ft- -lb
4
(47 to 54 N- -m)
35 to 40 ft- -lb
2
(47 to 54 N- -m)
3
UP
FRONT
5. Seal kit
Groundsmaster 4000--D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents