Mitsubishi Electric PUHY-200YMF-C Service Handbook page 43

Air conditioners city multi
Table of Contents

Advertisement

2 PUHY-P200·250YMF-C
Switch
Function
SWU
1~2
Unit address setting
SW1
1~8
For self diagnosis/
operation monitoring
9~10
SW2
1
Centralized control switch
2
Deletion of connection
information.
3
Deletion of error history.
4
5
6
Disregard ambient air
sensor errors, liquid
overflow errors.
7
Forced defrosting
8
Defrost prohibited timer
9
10
SW3
1
SW3-2 Function valid/
invalid
2
Indoor unit test operation
3
Defrosting start tempera-
ture of TH5.
4
Defrosting end tempera-
ture of TH5.
Opening angle of IC except
when heater thermostat is
ON during defrosting.
5
6
Models
7
Target Tc (High pressure)
at Heating
8
9
10
Models
SW4
1
SW4-2 Function valid/
invalid
2
Configuration compensa-
tion value
3
Note:
• SWU1~2=00 when shipped from the factory. Other factory settings are indicated by shaded portions.
• If the address is set from 01 to 50, it automatically becomes 100.
Function according to switch operation
When off
Set on 51~100 with the dial switch.
LED Monitering Display
Centralized control not
Centralized control
connected.
connected.
Storing of refrigeration
Deletion of refrigeration
system connection
system connection
information.
information.
Deletion
Errors valid.
Disregard errors.
Ordinary control
Start forced defrosting.
39 min.
SW3-2 Function invalid
SW3-2 Function valid
Stop all indoor units.
All indoor units test
operation ON.
– 4°C
8°C
(no operation)
PUHY-P-YMF-C
49˚C
Model P200
Invalid
Changes as shown below by on → off change
0% → 3% → 6% → 9% → 12% → –6% → –3% → 0%
–42–
When on
When off
Before power is turned on.
During normal operation when power
is on.
Should be set on OFF.
Before power is turned on.
Before power is turned on.
During normal operation when power
is on.
During normal operation when power
is on.
During normal
operation when
power is on.
90 min.
During normal operation when power
is on. (Except during defrosting)
During normal operation when power
is on.
When SW3-1 is ON after power is
turned on.
–1°C
During normal operation when power
is on.
15°C
During normal operation when power
is on. (Except during defrosting)
2000
PUY-P-YMF-C
When switching on the power.
53˚C
During normal operation when power
is on.
Model P250
When switching on the power.
Valid
During normal operation when power
is on.
when SW4-1 in ON.
Switch set timing
When on
10 minutes or
more after
compressor
starts.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents