2a.
2b.
STEP 3:
Remove the RED retaining clip by
unscrewing the fastener in the center of
clip and discard.
2
2c.
STEP 4:
a. Add additional 125 Amp, 2-pole
switch on right. Place in OFF posi-
tion. Before lowering switch on stabs
install interlock bar under the exist-
ing switch handle and the new switch
handle as shown.
b. Push both switches into the bus
stabs.
STEP 5:
a. Position operator under the hold
down bracket. Locate operator and
switch tie bracket around the two 125
Amp switches.
b. Install the two (2) screws (M3 x 6mm
PPHMS) to mount the switch tie
bracket to the operator mechanism.