CAC / BDP 8kW Owner's Manual page 72

Air-cooled, automatic standby generators
Table of Contents

Advertisement

Residential Transfer Switch Installation Guide
8.
From inside the building, feed the end of the 30-foot
conduit (INCLUDED and pre-wired from transfer switch)
through the wall to the outside.
9.
Remove the threaded lock nut from the conduit coupling.
The outer diameter of the threaded
end is 15/16 inches.
9
Threaded Lock Nut
10
ceal the hole. Seal around the hole and conduit with silicone
caulk from both the inside and outside of the building. Also,
caulk around the sides and top of the box to seal the edges
to the siding or wall. Connect wires to lugs; black to black,
white to white, and red to red. Torque nuts to 20 in/lbs. Snap
together the 4-pin and 2-pin plug connector. Loosen nut from
grounding lug and attach ground wire (green) from conduit.
Reinstall nut and tighten to 45 in/lbs. Reinstall internal cover
plate and screw. Close cover and install lock. This wiring is
complete.
4
Feed Conduit and Wires
8
Silicone
Caulk
The outer diameter of the conduit
connector is 1-11/16"
10. Lift cover. Remove internal
cover plate screw and internal
cover. Remove the knock out
in the lower right corner of the
external connection box. From
the rear of the connection box,
feed wires, 4-pin and 2-pin plugs
into box. Slip the lock nut over
wires and plugs and tighten
securely onto conduit coupling.
Using appropriate fasteners,
mount external connection box
over pre-drilled hole to fully con-
The outdoor connection box must be locked to
ensure safety and to discourage tampering.
11. Locate automatic transfer switch with built-in emergency
load center in close proximity to the main distribution
panel. The transfer switch can be located to the left or
right of the main distribution panel. Two (2) feet is the
suggested distance (see Figure 11). The transfer switch
may be located a different distance from the main panel
depending on available mounting area. Using the two
(2) foot conduit connected straight across to the main
panel is another option. Always adhere to local electrical
codes during installation. Hold transfer switch against
the mounting surface. Level the transfer switch and mark
the mounting holes. Drill the appropriate size pilot holes.
Mount transfer switch with built-in load center to mounting
surface with appropriate fasteners.
11
Suggested
The manufacturer recommends that a licensed elec-
trician or an individual with complete knowledge of
electricity perform the procedures in Sections 12 and
13.
Switch service main circuit breaker to the
OFF (OPEN) position prior to removal of
cover or removal of any wiring of the main
electrical distribution panel. The wires con-
nected to the service main circuit breaker
remain LIVE or HOT. Avoid contact with these wires and
the service main circuit breaker connection lugs.
Mounting Automatic Transfer Switch
Two (2)
Feet
Distance
OFF

Advertisement

Table of Contents
loading

This manual is also suitable for:

10kw17kw12kw20kw14kw16kw

Table of Contents