DVBR Series Direct Vent Gas Fireplace
Optional Fk-12 Fan Hook-up
1. Remove control cover from unit.
2. Remove glass door by rotating latches at bottom
corners of door. Refer to Page 23.
3. Remove the 9 screws securing burner to combustion
bottom.
4. Remove burner by lifting up and rotating toward front
of unit.
5. Set burner aside.
6. Install FK-12 fan in back of unit between hearth sup-
ports. (Fig. 72)
7. Secure fan on velcro strips.
8. Plug fan into EB-1 receptacle.
9. Be sure fan motor does not touch hearth supports.
Any electrical re-wiring of this fan must be
completed by a qualified electrician.
Turn off all power before hook-up.
Cold Air Box
Hearth
See
A
Support
Detail
EB-1 Re-
ceptacle
Cold Air Box
Side View
Front of
Unit
Base Pan
Hearth Pan
Detail
Fig. 72 FK-12 Fan Kit placement.
36
584-10
Fan placement
DVBR Series
Optional Accessories
Top View
FK-12 Fan
Base Pan
Hearth
Support
Access Cover
Hearth Pan
FK-12 Fan
A
584-10
Remote Controls
Optional remote control units are available to control
different functions of the appliance.
Model Functions Controlled
RC1
ON/OFF
RC2
ON/OFF and Temperature
IMTFK Wall mounted thermostat control
Ceramic Refractory Panels
1. Remove glass and logs.
2. Insert supports under ceramic hearth panels.
(Fig. 73)
3. Remove three (3) screws securing heat shield to
combustion dome. (Fig. 74)
4. Place rear ceramic panel in back of unit. (Fig. 75)
5. Place side panels.
6. Replace heat shield, logs and glass.
Burner
Hearth Panel
Fig. 73 Ceramic support.
Section A
H101
Heat Shield
Ceramic Panel Supports
3/16/99 djt
Front View
H103
Fig. 74 Heat shield.
heat shield
3/1/99 djt
Ceramic Support
Grate
Heat Shield
(3) Screws
Side View
Section A
20000584
H101
H103