Fer FALCON II Installation, Servicing & User Instructions page 12

Copper wall-mounted combination, gas fired boiler for central heating and domestic hot water production, fan assisted, room sealed compartment, electronic flame ignition and control
Table of Contents

Advertisement

3.01 Drilling Template (Top Flue Application)
Select suitable mounting position for boiler, using the template mark flue outlet and boiler mounting points. Drill two
10mm holes 90mm deep to accept the wall plugs, fit wall plugs. Fit two special wall plugs on the wall as described in
the fig. 12a. Fasten the wall bracket to the wall using an antitheft nut on the right side and a standard nut (M8) on the
left side. Mount the boiler on the wall bracket and fix using an antitheft nut on the left side and a standard nut (M8) on
the right side. Using a core drill cut a 118mm diameter hole for the flue.
1.
CH flow
2.
Safety Valve
3.
Domestic hot water outlet
4.
Gas supply
5.
Domestic hot water inlet
6.
CH return
12
FALCON II
15
=
Ø3/4''
Ø1/2''
Ø1/2''
1 2 3
Ø120
=
15
jig bracket
Ø1/2''
Ø1/2''
Ø3/4''
4
5
6
460 min
5 min
Fig. 12a
0
2 0
Fig. 12b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents