Venting The Boiler - Potterton Suprima 30 Installation Instructions Manual

Wall mounted fan flued gas boilers
Table of Contents

Advertisement

The Sealed System Module - Page 8
This Cap
MUST
be LOOSE
Fit
Automatic
Bleed Valve
Connect Flow
Pipe to boiler
Connect Return
Pipe to boiler
R eturn Pipe
(With Nut & Olive)
Flow Pipe
(With Nut
& Olive)
F rame
Connect
Return
Pipe
Flow Pipe
Flow Pipe
Securing Screws
'O' Ring
Mid Position
Valve
Fig. 8
8 Sealed System Boiler
Fit Manual Bleed Valve
Mains
Terminal
Block
Cable
Clamp
Supplied
(To secure
L
N
E
SwL
N
Pump
Mains
the pump
T h i s
A p p l i a n c e
m u s t
cable in
position)
Pump
Connection
Nut
Olive
Flow Pipe
Flow Pipe
Securing
Screws
'O' Ring
Connect The
Top Of
Flow Pipe
Extension
Example of
Discharge
Pipe
Connect the Gas Pipe to the Boiler
1. Connect the gas pipe to the gas valve adaptor
using the nut and olive supplied. Tighten the nuts
Mains
on the gas valve and bulkhead adaptors, turn ON
Cable
the gas at the meter and test for gas soundness.
Clamp
Connect the Flow and Return Pipes
1. Slide the flow pipe onto the boiler outlet
L
E
b e
E a r t h e d
connection and engage the bottom end of the
tube onto the flow pipe extension (flanged fitting)
ensuring that the 'O' ring seal is in place or to the
flanged inlet on the M.P.V.
Control
2. Tighten both connections and fit the Automatic
Panel
Bleed Valve (from the system module) to the
screwed connection. See Fig.8.
3. Slide the return pipe onto the boiler inlet
connection and engage the bottom end of the
tube into the fitting on the pump outlet.
(Compression fitting).
4. Tighten both connections and fit the Manual
Bleed Valve (from system module) to the
screwed connection. See Fig.8.
Pressure Relief Valves
The pressure relief valve on this module is pre-
set at 3 bar.
Install a pressure relief valve discharge pipe to
the valve, not less than 15 mm diameter and
connect to the tail pipe using a 15mm
compression fitting. The pipe run should be as
short as possible, run continuously downwards
and discharge to the outside of the building,
where possible over a drain.
The pipe end should be directed towards the
wall. The discharge point must be such that it will
not be hazardous to occupants or cause damage
to external electrical components or wiring.
IT MUST NOT DISCHARGE ABOVE AN
ENTRANCE, OR WINDOW, OR ANY TYPE OF
PUBLIC ACCESS. THE INSTALLER MUST
CONSIDER THAT THE OVERFLOW COULD
DISCHARGE BOILING WATER.

Venting the Boiler

The system can now be filled by connecting the filling
loop or opening the isolating valves. Pressurise and
top up to 1 Bar. Check for leaks. The pump must be
properly vented, it should NOT be run dry (this may
cause damage to the bearings).
Disconnect the filling loop.
Publication No. 559931

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suprima 50Suprima 40Suprima 60 he

Table of Contents