14.3 Outdoor PCB Test Run Operation (For Pump Down/Servicing Purpose)
The Test Run operation will be activated by short-circuiting CN-S (Pin 1 and 2) at outdoor unit PCB after power
supplied to outdoor unit terminal 1 and 2. The unit forced to run rated frequency cooling operation mode.
14.3.1
CU-E9PB4EA
64