When replacing any part on this appliance use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not ENGINEERED FOR PEACE OF MIND use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers. May 2004 UIN 200 943 A02...
Page 2
= An appliance designed for use on 2nd Family gas, Group H only. CAUTION. To avoid the possibility of injury during the installation, servicing or cleaning of this appliance, care should be taken when handling edges of sheet steel components. Mexico Super CF445 - CF475 - Installation & Servicing...
For the minimum clearances required for safety, and and microbore domestic central heating systems). subsequent service, see Frame 2. BS. 5546 Installation of gas hot water supplies for domestic purposes (2nd Family Gases). Mexico Super CF445 - CF475 - Installation & Servicing...
1/2" In addition a MINIMUM clearance of 533mm (21") MUST Additional space will be required for installation, depending upon be available at the front of the boiler for servicing. site conditions. Mexico Super CF445 - CF475 - Installation & Servicing...
The cupboard / compartment air vents must NOT conditions have returned to normal, subject to a built-in reset communicate with a bedroom, bed-sitting room or a room delay in excess of 10 minutes containing a bath or shower. Mexico Super CF445 - CF475 - Installation & Servicing...
Dotted lines indicate flow rates equivalent to a temperature rise and socket, serving only the boiler and system controls. The of 11 C (20 means of isolation must accessible to the user after installation. Mexico Super CF445 - CF475 - Installation & Servicing...
Page 8
A MINIMUM inclination of 25 mm per 3 m run (1" per 10') is required to avoid air locks. If the above conditions cannot be met then pumped primaries should be used. Mexico Super CF445 - CF475 - Installation & Servicing...
Page 9
Where access to a make-up vessel would be difficult by connected at the same point as the expansion vessel. pre-pressurisation of the system. Refer to 'Filling.' Mexico Super CF445 - CF475 - Installation & Servicing...
1. Remove the flue cleanout cover. 2. Ensure that the baffle(s) are fully inserted in the flueways. Baffles Side view of boiler sections showing the baffle MEX 2205 arrangements Mexico Super CF445 - CF475 - Installation & Servicing...
LH side of the boiler. 3. Test the gas installation for Gas conn soundness and purge in 1/8" accordance with BS.6891: 1988. Refer to Frame 25. All dimensions in mm Mexico Super CF445 - CF475 - Installation & Servicing...
MUST be wired into the mains lead, in Note. If there are no external controls the circulating pump parallel, with the control(s) to be overridden. Refer to MUST be wired into the control box. Frame 23. Mexico Super CF445 - CF475 - Installation & Servicing...
Terminal strip suitably enclosed Pump LEGEND b blue bk black br brown or orange MAINS w white gy grey Boiler supply connector yellow/green Mexico Super CF445 - CF475 - Installation & Servicing...
Designation of the terminals will vary, but the programmer and thermostat manufacturers' leaflets will give full details. If in doubt, ask your installer for advice. Mexico Super CF445 - CF475 - Installation & Servicing...
3. Retighten the union and check for gas soundness. WARNING. Whilst effecting the required gas soundness test and purging air from the gas installation, open all windows and doors, extinguish naked lights and DO NOT SMOKE. Mexico Super CF445 - CF475 - Installation & Servicing...
Fault Finding section. 12. Turn ON and check for gas soundness at the pressure 6. Test for gas soundness around ALL boiler gas components test point. using leak detection fluid. Mexico Super CF445 - CF475 - Installation & Servicing...
8. If the boiler is not fitted under a work top, access for flue Thermostat pocket MEX 729 cleaning will be improved by removing the top panel. Mexico Super CF445 - CF475 - Installation & Servicing...
4. Refit the injector, using an approved jointing compound. 6. Clean or renew components as necessary. 5. Inspect the pilot burner and ignition electrode - ensure that they are clear and in good condition. Mexico Super CF445 - CF475 - Installation & Servicing...
Refit the lower front panel in reverse order. Refer to After servicing, reference should be made to Table 2, Frame 24. page 2, which quotes details of the output with the burner pressure and heat input. Mexico Super CF445 - CF475 - Installation & Servicing...
9. Fit the new pilot burner and re-assemble in reverse order, ensuring that: a. The injector is in position when refitting the pilot supply. b. A gas-tight joint is made. c. The spark gap is correct. Refer to Frame 44. Mexico Super CF445 - CF475 - Installation & Servicing...
11. Remove the 2 screws to release the thermostat bracket. 12. Unplug the in-line connector to TTB thermostat. 15. Assemble new control box and panel and fit to the casing in reverse order. Mexico Super CF445 - CF475 - Installation & Servicing...
7. Replace the lower front panel and secure with the 2 fixing screws. 8. Check the operation of the boiler. Hook plate Thermostat pocket Mex 1861 Sensor end Mexico Super CF445 - CF475 - Installation & Servicing...
Withdraw the burner. 8. Fit the new burner and reassemble in reverse order, taking care not to damage the main burner injector which is screwed into the burner manifold. Mexico Super CF445 - CF475 - Installation & Servicing...
'O' ring seal Securing c. An approved jointing compound screws is used when reconnecting the Gas control gas inlet pipe. valve Gas inlet pipe Burner manifold Mexico Super CF445 - CF475 - Installation & Servicing...
6. Compress the barbs on the PCB stand-offs to release the PCB from the box 7. Fit the new PCB and reassemble in reverse order. 8. Refit the boiler casing. 9. Check the operation of the boiler. Mexico Super CF445 - CF475 - Installation & Servicing...
Is the main injector blocked? Replace main gas solenoid valve. Does the main burner light? Clear blockage and refit. Does main burner light? Boiler operating Check for correct gas Replace supply pressure. satisfactorily valve Rectify as necessary. Mexico Super CF445-475 - Installation & Servicing...
When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers.
52 BOILER CONTROL PANEL - Exploded View Legend 63. Control panel complete 64. Control panel. 65. Control box. 66. Control thermostat. 67. Thermostat knob. 71. Control front panel (door). 72. Magnetic strip. Mexico Super CF445 - CF475 - Installation & Servicing...
Page 36
They have been tested and conform with the provisions of BS. 6332 and BS. 5258. Ideal Boilers, P.O. Box 103, National Ave, Kingston upon Hull, HU5 4JN. Telephone: 01482 492 251 Fax: 01482 448 858. Registration No. London 322 137.
Need help?
Do you have a question about the CF445 and is the answer not in the manual?
Questions and answers