OWL Intuition RBT-3C Installation Instructions Manual page 13

Heating control room sensor
Hide thumbs Also See for Intuition RBT-3C:
Table of Contents

Advertisement

• Y-Plan and S-Plan wiring diagrams are supplied with the OWL Intuition
Tank Sensor product. They can also be downloaded from the Intuition web
dashboard under Support & Manuals.
• Please ensure that all installations comply with the current IEE regulations.
• Please consult the boiler manufacturers installation instructions before making these
connections and note that a link may need to be removed when connecting external
controls.
4. Fit Safety Cover - Check all of the wiring is safely attached to the appropriate back-
plate terminals and the screws are tight. Then fit the Safety Cover by clipping it into
place over the wiring terminals.
5. Complete the installation by mounting the Room Sensor to the backplate. To do this
engage the Room Sensor on the lugs at the top of the backplate, then carefully swing
the Room Sensor down and push it carefully back into its plug-in terminal connectors.
Locate over the captive screws at the base of the backplate and tighten them so that
the Room Sensor is locked into position.
6. Existing Programmer / Time Clock - any existing programmer or time clock is
now redundant. You should either program it to be permanently on (24/7) or prefer-
ably remove it, ensuring that the two wires it was switching are safely electrically
linked together, preferably by installing a link wire within the boiler. Please check boiler
manufacturers wiring instructions for further details.
7. Finally check that the Room Sensor is functioning correctly and switching the boiler
© 2 Save Energy Limited 2013
13

Advertisement

Table of Contents
loading

Related Products for OWL Intuition RBT-3C

This manual is also suitable for:

Intuition rbh-3c

Table of Contents