Dimplex LAW 9IMR Installation And Operating Instructions Manual

Dimplex LAW 9IMR Installation And Operating Instructions Manual

Split air-to-water heat pump with hydrotower
Table of Contents

Advertisement

Available languages

Available languages

LAW 9IMR
LAW 14ITR
LAW 14ITR
Split-Luft/Wasser-
Wärmepumpe mit
Hydrotower
Bestell-Nr. / Order no. / N
Split air-to-water
heat pump with
hydrotower
o
de commande : 452162.66.04
Montage- und
Gebrauchsanweisung
Installation and
Operating Instructions
Instructions d'installation
et d'utilisation
LAW 9IMR
Pompe à chaleur
deux unités air/eau
avec tour
hydraulique
combinée
FD 9309

Advertisement

Chapters

Table of Contents
loading

Summary of Contents for Dimplex LAW 9IMR

  • Page 1 LAW 9IMR LAW 14ITR Montage- und Gebrauchsanweisung Installation and Operating Instructions Instructions d’installation et d’utilisation LAW 14ITR LAW 9IMR Split-Luft/Wasser- Split air-to-water Pompe à chaleur Wärmepumpe mit heat pump with deux unités air/eau Hydrotower hydrotower avec tour hydraulique combinée Bestell-Nr. / Order no. / N de commande : 452162.66.04...
  • Page 3: Table Of Contents

    LAW 9IMR - LAW 14ITR Inhaltsverzeichnis Bitte sofort lesen ........................DE-2 1.1 Wichtige Hinweise ..........................DE-2 1.2 Bestimmungsgemäßer Gebrauch......................DE-2 1.3 Gesetzliche Vorschriften und Richtlinien ..................... DE-2 Verwendungszweck ........................DE-3 2.1 Anwendungsbereich ..........................DE-3 2.2 Allgemeine Eigenschaften ........................DE-3 Lieferumfang..........................DE-3 3.1 Inneneinheit ............................
  • Page 4: Bitte Sofort Lesen

    LAW 9IMR - LAW 14ITR Bitte sofort lesen 1.2 Bestimmungsgemäßer Gebrauch 1.1 Wichtige Hinweise Dieses Gerät ist nur für den vom Hersteller vorgesehenen Ver- wendungszweck freigegeben. Ein anderer oder darüber hinaus ACHTUNG! ACHTUNG! gehender Gebrauch gilt als nicht bestimmungsgemäß. Dazu Verwenden Sie nie sand-, soda-, säure- oder chloridhaltige Putzmittel, da...
  • Page 5: Verwendungszweck

    LAW 9IMR - LAW 14ITR Verwendungszweck 3.2 Schaltblech ACHTUNG! ACHTUNG! 2.1 Anwendungsbereich Vor Öffnen des Gerätes ist sicherzustellen, dass alle Stromkreise spannungsfrei geschaltet sind. Die Inneneinheit bildet die Schnittstelle zwischen einer reversib- len Wärmepumpe und dem Heiznetz im Gebäude. Die Innenein-...
  • Page 6: Aufstellung

    LAW 9IMR - LAW 14ITR Aufstellung 5.2 Außeneinheit  Es wird empfohlen, die Außeneinheit wandnah auf einem 5.1 Inneneinheit vom Gebäude getrennten Fundament zu montieren mit einem Abstand von mindestens 0,3 m an der Ansaugseite Das Gerät ist grundsätzlich in Innenräumen auf einer ebenen, (Abb.
  • Page 7 LAW 9IMR - LAW 14ITR 5.2.1 Wanddurchbruch für Split- und Elektroleitungen  Zum Verlegen der Split- und Elektroleitungen gehen Sie bitte wie folgt vor:  Bohren Sie eine 70 mm-Öffnung für die Rohrleitungen mit einem Kernbohrer.  Die Rohrleitungsöffnung sollte zum Außengerät hin leicht geneigt sein, sodass kein Regen in das Gebäude eindringen...
  • Page 8: Vorsichtshinweise Im Winter Und Bei Jahreszeitlich Bedingten Winden

    Abfluss geführt werden. Küstengebieten nicht eingehalten werden können, setzen Sie sich bitte Bevor die heizwasserseitigen Anschlüsse der Wärmepumpe er- mit Dimplex Mitarbeitern in Verbindung, um weitere Hinweise zum folgen, muss die Heizungsanlage gespült werden, um eventuell Korrosionsschutz zu erhalten. vorhandene Verunreinigungen, Reste von Dichtmaterial oder Ähnliches zu entfernen.
  • Page 9 LAW 9IMR - LAW 14ITR Nach erstellter heizungsseitiger Installation ist die Heizungsan- lage zu füllen, zu entlüften und abzudrücken. Beim Füllen der Anlage ist folgendes zu beachten:  unbehandeltes Füll- und Ergänzungswasser muss Trink- wasserqualität haben (farblos, klar, ohne Ablagerungen) ...
  • Page 10: Inbetriebnahme

    LAW 9IMR - LAW 14ITR Inbetriebnahme Wärmequellen- max. Temperaturspreizung temperatur zwischen Heizungsvor- und 7.1 Allgemein Rücklauf -20 °C -15 °C Um eine ordnungsgemäße Inbetriebnahme zu gewährleisten, -14 °C -10 °C sollte diese von einem vom Werk autorisierten Kundendienst du- -9 °C -5 °C...
  • Page 11: Anschluss Der Rohrleitungen Und Kabel Am Außengerät

    LAW 9IMR - LAW 14ITR Anschluss der Herstellungsbetrieb (Siehe Etikett des Modellnamens) Montagebetrieb (Nach Möglichkeit neben den Wartungsan- Rohrleitungen und schlüssen zum Hinzufügen oder Entfernen von Kältemittel Kabel am Außengerät anbringen) Gesamtbefüllung (1, + 2,) In diesem Kapitel werden die Kältemittelrohranschlüsse und die 8.1.2 Vorbereitung für Rohrleitungen...
  • Page 12 LAW 9IMR - LAW 14ITR Schritt 4: Bördelung 8.1.3 Rohranschlüsse am Innengerät  Bördelungen müssen wie folgt mit einem Bördelgerät für R- Der Rohranschluss am Innengerät erfolgt in zwei Schritten. 410A-Kältemittel vorgenommen werden, wie in der Abbil- Lesen Sie die folgenden Anleitungen sorgfältig.
  • Page 13: Elektrische Anschlüsse

    LAW 9IMR - LAW 14ITR 8.2 Elektrische Anschlüsse Schritt 2: Befestigung  Richten Sie die Mitte der Rohre aus und ziehen Sie die Schraubenmutter mit der Hand fest. 8.2.1 Außengerät  Ziehen Sie die Schraubenmutter mit einem Schrauben- schlüssel bis zum Klicken fest.
  • Page 14: Abschließende Arbeiten

    LAW 9IMR - LAW 14ITR 8.3 Abschließende Arbeiten 8.2.2 Innenteil Am Innenteil müssen zwei Versorgungsleitungen angeschlossen Nach dem Anschluss der Rohre und elektrischen Kabel müssen werden: Die Leistungsversorgung der Wärmepumpe und die die Rohre gebogen und einige Tests durchgeführt werden. Die Steuerspannung für den integrierten Wärmepumpenmanager...
  • Page 15: Dichtigkeitsprüfung Und Evakuieren

    LAW 9IMR - LAW 14ITR Die Gasflasche wird normalerweise in aufrechter Position verwendet. Alle Rohrverbindungen (Innen und Außen) und Wartungsventile der Luft- und Flüssigkeitsseite auf Lecks prüfen. Blasen weisen auf ein Leck hin. Die Seife muss mit einem sauberen Tuch abgewischt werden.
  • Page 16: Prüfpunkte, Wartung Und Störungsbehebung

    LAW 9IMR - LAW 14ITR Prüfpunkte, Wartung Gehen Sie vor der Inbetriebnahme die in diesem Kapitel be- schriebenen Prüfpunkte durch. und Störungsbehebung Hier finden Sie ebenfalls einige Hinweise zur Wartung und Stö- rungsbehebung. Falls bisher keine Störungen eingetreten sind, kann das Gerät nun in Betrieb genommen werden, um die Vorzüge der LAW-...
  • Page 17: Wartung

    LAW 9IMR - LAW 14ITR 9.2 Wartung ACHTUNG! ACHTUNG! Vor Öffnen des Gerätes ist sicherzustellen, dass alle Stromkreise Für eine optimale Leistung der LAW-Split-Wärmepumpe sollte spannungsfrei geschaltet sind das Gerät regelmäßig überprüft und gewartet werden. Es wird empfohlen, mindestens einmal pro Jahr die folgende Checkliste abzuarbeiten.
  • Page 18: Kennlinien Temperaturfühler Außengerät

    LAW 9IMR - LAW 14ITR 9.4 Kennlinien Temperaturfühler Außengerät Luftsensor (Ausseneinheit) NTC - 10 Temperatur in °C k 80,2 58,2 44,0 37,4 33,6 30,3 25,9 20,2 15,8 13,8 12,5 11,4 10,5 Temperatur in °C k 10,0 9,57 8,76 8,04 7,38...
  • Page 19: Reinigung / Pflege

    LAW 9IMR - LAW 14ITR 10 Reinigung / Pflege 11 Störungen / Fehlersuche LAWC-Geräte sind Qualitätsprodukte und sollten störungsfrei ar- 10.1 Pflege beiten. Tritt dennoch einmal eine Störung auf, wird diese im Dis- play des Wärmepumpenmanagers angezeigt. Schlagen Sie Vermeiden Sie zum Schutz des Mantels das Anlehnen und Able- dazu auf der Seite „Störungen und Fehlersuche“...
  • Page 20: Geräteinformation

    LAW 9IMR - LAW 14ITR 13 Geräteinformation Typ- und Verkaufsbezeichnung LAW 9IMR LAW 14ITR Bauform Wärmequelle Luft Luft Ausführung Split reversibel Split reversibel Regler WPM Econ5Plus integriert WPM Econ5Plus integriert Wärmemengenzählung Aufstellungsort Innen / Außen Innen / Außen Leistungsstufe variabel...
  • Page 21: Elektrischer Anschluss

    LAW 9IMR - LAW 14ITR Elektrischer Anschluss Lastspannung / Absicherung Verdichter 1~/N/PE 230 V (50 Hz) / C25 A Heizpatrone 1~/N/PE 230 V (50 Hz) / C35 A Verdichter + Heizpatrone 3~/N/PE 400 V (50 Hz) / C32 A 3~/N/PE 400 V (50 Hz) / C32 A...
  • Page 22 LAW 9IMR - LAW 14ITR DE-20 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 23 LAW 9IMR - LAW 14ITR Table of contents Please read immediately......................EN-2 1.1 Important notes............................ EN-2 1.2 Intended use ............................EN-2 1.3 Legal regulations and guidelines ......................EN-2 Purpose ............................EN-3 2.1 Intended purpose..........................EN-3 2.2 General properties ..........................EN-3 Scope of supply..........................
  • Page 24: Please Read Immediately

    LAW 9IMR - LAW 14ITR Please read 1.2 Intended use immediately This device is only intended for use as specified by the manufac- turer. Any other use beyond that intended by the manufacturer is prohibited. This requires the user to abide by the relevant project 1.1 Important notes...
  • Page 25: Purpose

    LAW 9IMR - LAW 14ITR Purpose 3.2 Contact plate ATTENTION! 2.1 Intended purpose Before opening the device, ensure that all electric circuits are disconnected from the power supply. The indoor unit constitutes the interface between a reversible heat pump and the heating system in the building. The indoor The contact plate is in the top area of the indoor unit.
  • Page 26: Installation

    LAW 9IMR - LAW 14ITR Installation 5.2 Outdoor unit  It is advisable to install the outdoor unit close to a wall, on a 5.1 Indoor unit foundation separate from the building with a minimum clear- ance of 0.3 m on the intake side (Fig. 5.2 + Fig. 5.3).
  • Page 27 LAW 9IMR - LAW 14ITR 5.2.1 Wall opening for split lines and electric wires  Please proceed as follows when laying split lines and elec- tric wires:  Drill a 70 mm opening for the pipework using a core drill ...
  • Page 28: Precautions In Winter And In Seasonal Winds

    If the outlined requirements cannot be complied with during installation residue from sealants, etc. Any accumulation of deposits in the in coastal areas, please contact Dimplex employees for more information liquefier may cause the heat pump to completely break down.
  • Page 29: Frost Protection

    LAW 9IMR - LAW 14ITR The following points must be observed when filling the system:  Untreated filling water and make-up water must be of drink- ing water quality. (colourless, clear, free of sediments)  Filling water and make-up water must be pre-filtered (max.
  • Page 30: Commissioning

    LAW 9IMR - LAW 14ITR Commissioning Heat source Max. temperature spread temperature between heating flow and return 7.1 General flow from -20 °C -15 °C To ensure that commissioning is performed correctly, it should -14 °C -10 °C only be carried out by an after-sales service technician author- -9 °C...
  • Page 31: Connecting The Pipework And Cables To The Outdoor Unit

    LAW 9IMR - LAW 14ITR Connecting the Production operation (see model name label) Installation operation (where possible, attach alongside the pipework and cables to maintenance connections for adding or removing refriger- the outdoor unit ant) Total filling (1, + 2,) This chapter describes the refrigerant pipe connections and the 8.1.2 Preparation for pipework...
  • Page 32 LAW 9IMR - LAW 14ITR Step 4: Flanging 8.1.3 Pipe connections on the indoor unit  Flanging must be carried out as follows with a flanging tool The pipe connection on the indoor unit takes place in two steps. for R-410A refrigerant as shown in the figure.
  • Page 33: Electrical Connections

    LAW 9IMR - LAW 14ITR 8.2 Electrical connections Step 2: Fastening  Align the centre of the pipe and tighten the screw nuts by hand. 8.2.1 Outdoor unit  Tighten the screw nuts with a spanner until they click. ...
  • Page 34: Final Work

    LAW 9IMR - LAW 14ITR 8.3 Final work 8.2.2 Indoor component Two supply cables must be connected to the indoor component: Once the pipes and electric cables have been connected, the The power supply to the heat pump and the control voltage for pipes must be bent and a number of tests carried out.
  • Page 35: Leak Test And Evacuation

    LAW 9IMR - LAW 14ITR The gas cylinder is usually used in an upright position. Check all pipe connections (indoor and outdoor) and main- tenance valves of the air and liquid side for leaks. Bubbles indicate a leak. The soap must be wiped away with a clean cloth.
  • Page 36: Test Points, Maintenance And Troubleshooting

    LAW 9IMR - LAW 14ITR Test points, maintenance and troubleshooting If no faults have occurred here by this point, the unit can now be operated and you can enjoy the benefits of the LAW split heat pump. Before commissioning the unit, run through the test points out- lined in this chapter.
  • Page 37 LAW 9IMR - LAW 14ITR 9.2 Maintenance ATTENTION! Before opening the unit, ensure that all electric circuits are isolated from To maintain an optimal output on the LAW split heat pump, regu- the power supply. lar checks and maintenance work should be carried out on the unit.
  • Page 38: Characteristic Curve Temperature Sensor Outdoor Unit

    LAW 9IMR - LAW 14ITR 9.4 Characteristic curve temperature sensor outdoor unit Air sensor (outdoor unit) NTC - 10 Temperature in °C k 80,2 58,2 44,0 37,4 33,6 30,3 25,9 20,2 15,8 13,8 12,5 11,4 10,5 Temperature in °C k...
  • Page 39: Cleaning / Maintenance

    LAW 9IMR - LAW 14ITR 10 Cleaning / maintenance 11 Faults / troubleshooting LAWC devices are high-quality products and should work without 10.1 Maintenance problems. Should a fault occur, however, it will be indicated on the heat pump manager display. In this case, consult the "Faults To protect the cover, avoid leaning anything against the device or and troubleshooting"...
  • Page 40: Device Information

    LAW 9IMR - LAW 14ITR 13 Device information Type and order code LAW 9IMR LAW 14ITR Design Heat source Model Split reversible Split reversible Controller WPM Econ5Plus integrated WPM Econ5Plus integrated Thermal energy metering Installation location Indoors / outdoors Indoors / outdoors...
  • Page 41: Electrical Connection

    LAW 9IMR - LAW 14ITR Electrical connection Supply voltage / fuse protection Compressor 1~/N/PE 230 V (50 Hz) / C25 A Heating cartridge 1~/N/PE 230 V (50 Hz) / C35 A Compressor + heating cartridge 3~/N/PE 400 V (50 Hz) / C32 A...
  • Page 42 LAW 9IMR - LAW 14ITR EN-20 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 43 LAW 9IMR - LAW 14ITR Table des matières À lire immédiatement ......................... FR-2 1.1 Remarques importantes ........................FR-2 1.2 Utilisation conforme ..........................FR-2 1.3 Dispositions légales et directives......................FR-2 Utilisation ............................ FR-3 2.1 Domaine d’utilisation..........................FR-3 2.2 Généralités ............................FR-3 Fournitures ..........................FR-3 3.1 Unité intérieure .............................FR-3 3.2 Panneau de commande........................FR-3...
  • Page 44 LAW 9IMR - LAW 14ITR À lire immédiatement 1.2 Utilisation conforme Cet appareil ne doit être employé que pour l’affectation prévue 1.1 Remarques importantes par le fabricant. Toute autre utilisation est considérée comme non conforme. La documentation accompagnant les projets doit également être prise en compte.
  • Page 45 LAW 9IMR - LAW 14ITR Utilisation 3.2 Panneau de commande ATTENTION ! ATTENTION ! 2.1 Domaine d’utilisation Avant d’ouvrir l’appareil, s'assurer que tous les circuits électriques sont bien hors tension. L'unité intérieure sert d’interface entre une pompe à chaleur ré- versible et le circuit de chauffage du bâtiment.
  • Page 46 LAW 9IMR - LAW 14ITR Installation 5.2 Unité extérieure  Il est conseillé de monter l'unité extérieure près d'un mur, 5.1 Unité intérieure sur une fondation distincte du bâtiment, avec un écart d'au moins 0,3 m côté aspiration (Fig.5.2 + Fig.5.3).
  • Page 47 LAW 9IMR - LAW 14ITR 5.2.1 Percée murale pour les fils électriques et des deux unités  Pour poser les fils électriques et des deux unités, procéder comme suit :  Percer une ouverture de 70 mm pour les tuyauteries à l'aide d'une carotteuse.
  • Page 48 Si les exigences décrites pour le montage dans des zones côtières ne versées de l'appareil. peuvent pas être respectées, contacter les collaborateurs de Dimplex Un flexible ¾" en matière plastique indéformable (diamètre exté- pour obtenir d'autres instructions sur la protection contre la corrosion.
  • Page 49 LAW 9IMR - LAW 14ITR Avant de procéder au raccordement de la pompe à chaleur côté Les tuyaux de raccordement du chauffage à la pompe à chaleur eau de chauffage, l’installation de chauffage doit être rincée pour peuvent éventuellement être sortis en dessous du ballon au ni- éliminer d’éventuelles impuretés, des restes potentiels de maté-...
  • Page 50: Mise En Service

    LAW 9IMR - LAW 14ITR Protection antigel d'erreur et à une augmentation du besoin en énergie électrique. Pour régler la soupape différentielle correctement, nous vous Prévoir éventuellement une vidange manuelle sur les unités inté- conseillons de procéder de la manière suivante.
  • Page 51 LAW 9IMR - LAW 14ITR Raccordement des REMARQUE Si l’unité intérieure est montée plus haut que l’unité extérieure, et que la tuyauteries et des différence de hauteur dépasse 4 m, le montage de réservoirs et de câbles au niveau de siphons d’huile dans la conduite de gaz chaud doit être vérifié...
  • Page 52 LAW 9IMR - LAW 14ITR Étape 3 : poser des écrous 8.1.3 Raccordements de tuyaux à l'unité  Enlever les écrous des unités intérieure et extérieure. intérieure Poser les écrous dans le tuyau ébavuré.  Les raccordements de tuyaux à l'unité intérieure s'effectuent en ...
  • Page 53 LAW 9IMR - LAW 14ITR 8.2 Branchements électriques Étape 2 : fixer  Centrer le milieu du tuyau et serrer manuellement les écrous. 8.2.1 Unité extérieure  Serrer les écrous à l'aide d'une clé anglaise jusqu'au clic.  Couples de serrage REMARQUE Les commutateurs DIP présents sur les platines de l'unité...
  • Page 54 LAW 9IMR - LAW 14ITR 8.2.2 Unité intérieure Les lignes électriques peuvent être acheminées du dessous (dans la zone de branchement frigorifique) ou du dessus (un Deux lignes d'alimentation doivent être raccordées à l'unité inté- chemin de câble est tracé dans la mousse en polyuréthane sous rieure : l'alimentation de puissance de la pompe à...
  • Page 55 LAW 9IMR - LAW 14ITR REMARQUE Pour empêcher la pénétration d'azote liquide dans le système de rafraîchissement, lors de la mise en pression du système, la face supérieure de la bouteille de gaz doit être plus haute que le dessous.
  • Page 56 LAW 9IMR - LAW 14ITR Points de contrôle, maintenance et dépannage Si jusqu'à ce stade aucune anomalie ne s'est produite, l'appareil Avant la mise en service, parcourir les points de contrôle décrits peut être mis en service pour pouvoir profiter des avantages de dans ce chapitre.
  • Page 57 LAW 9IMR - LAW 14ITR 9.2 Maintenance ATTENTION ! ATTENTION ! Avant d’ouvrir l’appareil, s'assurer que tous les circuits électriques sont Pour une puissance optimale de la pompe à chaleur à deux uni- bien hors tension. tés LAW, l'appareil doit être vérifié et entretenu régulièrement.
  • Page 58 LAW 9IMR - LAW 14ITR Courbes caractéristiques de la sonde de température de l'unité extérieure Capteur d'air (unité extérieure) NTC - 10 Température en °C k 80,2 58,2 44,0 37,4 33,6 30,3 25,9 20,2 15,8 13,8 12,5 11,4 10,5 Température en °C k...
  • Page 59: Mise Hors Service

    LAW 9IMR - LAW 14ITR 10 Nettoyage / entretien 10.3 Anode anticorrosion L’anode anticorrosion montée intégrée au ballon d’eau chaude 10.1 Entretien sanitaire doit être contrôlée électriquement à intervalles réguliers et tous les deux ans au minimum après la mise en service. La Pour protéger la jaquette de la tour hydraulique combinée, il faut...
  • Page 60 LAW 9IMR - LAW 14ITR 13 Informations sur les appareils Désignation technique et référence de commande LAW 9IMR LAW 14ITR Design Source de chaleur Version Deux unités, réversible Deux unités, réversible Gestionnaire de PAC Econ5Plus Gestionnaire de PAC Econ5Plus Régulateur intégré...
  • Page 61 LAW 9IMR - LAW 14ITR Branchements électriques Tension de puissance/ 1~/N/PE 230 V (50 Hz) / C25 A protection par fusibles compresseur cartouche chauffante 1~/N/PE 230 V (50 Hz) / C35 A compresseur + cartouche chauffante 3~/N/PE 400 V (50 Hz) / C32 A...
  • Page 62 LAW 9IMR - LAW 14ITR FR-20 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 63: Anhang / Appendix / Annexes

    1.3 Fundamentplan / Foundation plan / Plan des fondations LAW 9IMR + LAW 14ITR........................A-VI 1.4 Maßbild Inneneinheit / Dimension drawing indoor unit / Schéma coté unité intérieure LAW 9IMR + LAW 14ITR ...............A-VII Diagramme / Diagrams / Diagrammes..................A-VIII 2.1 Einsatzgrenzendiagramm Heizen / Operating limits diagram heating / Diagramme des plages d'utilisation pour le chauffage ................A-VIII...
  • Page 64: Maßbilder / Dimension Drawings / Schémas Cotés

    LAW 9IMR - LAW 14ITR 1 Maßbilder / Dimension Drawings / Schémas cotés 1.1 Maßbild Außengerät / Dimension drawing outdoor unit / Schéma coté unité extérieure LAW 9IMR Kondensatablauf Kondensatablauf / Condensate drain / Écoulement des condensats 4 Öffnungen für Dübelschrauben /...
  • Page 65 LAW 9IMR - LAW 14ITR 1.2 Maßbild Außengerät / Dimension drawing outdoor unit / Schéma coté unité extérieure LAW 14ITR Allgemeine Informationen General information Informations générales Außengerät (extern) Heizleistung des Gerätes: Heat output of the device: Outdoor unit (external) Puissance calorifique de l'appareil : Unité...
  • Page 66 LAW 9IMR - LAW 14ITR 1.3 Fundamentplan / Foundation plan / Plan des fondations LAW 9IMR + LAW 14ITR A-VI 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 67 LAW 9IMR - LAW 14ITR 1.4 Maßbild Inneneinheit / Dimension drawing indoor unit / Schéma coté unité intérieure LAW 9IMR + LAW 14ITR www.dimplex.de 452162.66.04 · FD 9309 A-VII...
  • Page 68: Diagramme / Diagrams / Diagrammes

    LAW 9IMR - LAW 14ITR 2 Diagramme / Diagrams / Diagrammes 2.1 Einsatzgrenzendiagramm Heizen / Operating limits diagram heating / Diagramme des plages d'utilisation pour le chauffage Wasseraustritt (+/- 2 K) Water outlet (+/- 2 K) Sortie d'eau (+/- 2 K) Wärmequelleneintrittstemperatur [°C]...
  • Page 69 LAW 9IMR - LAW 14ITR 2.2 Einsatzgrenzendiagramm Kühlen / Operating limits diagram cooling / Diagramme des plages d'utilisation pour le rafraîchissement Wasseraustritt (+/- 2 K) Water outlet (+/- 2 K) Sortie d'eau (+/- 2 K) Wärmesenkeneintrittstemperatur [°C] Heat sink inlet temperature [°C] Température d'entrée de dissipation thermique [°C]...
  • Page 70: Stromlaufpläne / Circuit Diagrams / Schémas Électriques

    LAW 9IMR - LAW 14ITR 3 Stromlaufpläne / Circuit diagrams / Schémas électriques 3.1 Steuerung / Control / Commande 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 71 LAW 9IMR - LAW 14ITR 3.2 Steuerung / Control / Commande www.dimplex.de 452162.66.04 · FD 9309 A-XI...
  • Page 72 LAW 9IMR - LAW 14ITR 3.3 Last / Load / Puissance A-XII 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 73 LAW 9IMR - LAW 14ITR 3.4 Anschlussplan / Circuit diagram / Plan de branchement électrique www.dimplex.de 452162.66.04 · FD 9309 A-XIII...
  • Page 74 LAW 9IMR - LAW 14ITR 3.5 Anschlussplan / Circuit diagram / Plan de branchement électrique A-XIV 452162.66.04 · FD 9309 www.dimplex.de...
  • Page 75 LAW 9IMR - LAW 14ITR 3.6 Legende / Legend / Légende Brücke EVU-Sperre, muss eingelegt werden, wenn Utility block (EVU) bridge must be inserted if no Pont de blocage de la société d'électricité, à insérer kein EVU-Sperrschütz vorhanden ist utility blocking contactor is present en absence de contacteur de blocage de la société...
  • Page 76 LAW 9IMR - LAW 14ITR R13* Fühler regenerativ, Raumfühler, Renewable sensor, room sensor, Sonde mode régénératif, sonde d'ambiance, Fühler 3. Heizkreis sensor for heating circuit 3 sonde 3ème circuit de chauffage Heißgasfühler Hot gas sensor Sonde de gaz chaud Verdampfungstemperatur Evaporation temperature Température d'évaporation...
  • Page 77: Hydraulische Einbindungsschemen / Hydraulic Integration Diagrams / Schémas D'intégration Hydraulique

    LAW 9IMR - LAW 14ITR 4 Hydraulische Einbindungsschemen / Hydraulic integration diagrams / Schémas d'intégration hydraulique 4.1 Monoenergetische Anlage mit einem Heizkreis und Warmwasserbereitung / Mono energy system with one heating circuit and domestic hot water preparation / Installation mono-énergétique avec un circuit de chauffage et production d'eau chaude sanitaire www.dimplex.de...
  • Page 78 LAW 9IMR - LAW 14ITR 4.2 Monoenergetische Anlage mit zwei Heizkreisen und Warmwasserbereitung / Mono energy system with two heating circuits and domestic hot water preparation / Installation mono-énergétique avec deux circuits de chauffage et production d'eau chaude sanitaire A-XVIII 452162.66.04 ·...
  • Page 79 LAW 9IMR - LAW 14ITR 4.3 Bivalente Anlage mit einem Heizkreis und Warmwasserbereitung / Bivalent system with one heating circuit and domestic hot water preparation / Installation bivalente avec un circuit de chauffage et production d'eau chaude sanitaire www.dimplex.de 452162.66.04 · FD 9309...
  • Page 80 LAW 9IMR - LAW 14ITR 4.4 Bivalent regenerative Anlage mit einem Heizkreis und Warmwasserbereitung / Bivalent-renewable system with one heating circuit and domestic hot water preparatio / Installation régénérative bivalente avec un circuit de chauffage et production d'eau chaude sanitaire A-XX 452162.66.04 ·...
  • Page 81 LAW 9IMR - LAW 14ITR 4.5 Legende / Legend / Légende Absperrventil Shut-off valve Vanne d’arrêt Überstromventil Overflow valve Soupape différentielle Sicherheitsventilkombination Safety valve combination Jeu de vannes de sécurité Umwälzpumpe Circulating pump Circulateur Ausdehnungsgefäß Expansion vessel Vase d’expansion Room temperature-controlled valve Vanne commandée par...
  • Page 82: Konformitätserklärung / Declaration Of Conformity / Déclaration De Conformité

    LAW 9IMR - LAW 14ITR 5 Konformitätserklärung / Declaration of Conformity / Déclaration de conformité EG - Konformitätserklärung EC Declaration of Conformity Déclaration de conformité CE Der Unterzeichnete Glen Dimplex Deutschland GmbH The undersigned Geschäftsbereich Dimplex L’entreprise soussignée, Am Goldenen Feld 18 D - 95326 Kulmbach bestätigt hiermit, dass das (die)
  • Page 83 LAW 9IMR - LAW 14ITR www.dimplex.de 452162.66.04 · FD 9309 A-XXIII...
  • Page 84 Glen Dimplex Deutschland GmbH Irrtümer und Änderungen vorbehalten. Geschäftsbereich Dimplex Subject to alterations and errors. Am Goldenen Feld 18 Sous réserve d’erreurs et modifications. D-95326 Kulmbach +49 (0) 9221 709 565 www.dimplex.de...

This manual is also suitable for:

Law 14itr

Table of Contents