Download Print this page
Nustep T4 Installation Instructions Manual

Nustep T4 Installation Instructions Manual

Servicebyair dtw nustep bikes
Hide thumbs Also See for T4:

Advertisement

Quick Links

TM
Addendum: Account 4504 – ServiceByAir DTW NuStep Bikes 
Synopsis: NonstopDelivery is providing threshold and white glove delivery services with assembly of 
NuStep exercise bikes for ServiceByAir DTW.    There may be existing equipment at the location to be 
picked up and packaged.    All freight will be delivered to the NSD location via multiple carriers, primarily 
Forward Air, ABF, Con‐way and Estes.    Final consignees will primarily be located in medical facilities.       
Service Levels:   
Threshold – Delivery of the freight with a two man team to the customer's first available room at their 
location. 
 
Whiteglove – Delivery of the freight with a two man team to the customer's room of choice, 
unpackaging, debris removal, assembly, possible pickup and packaging of existing NuStep. 
 
Scheduling: Contact to schedule delivery must be initiated with 24 hours of receiving the merchandise.   
Delivery must be completed with 72 hours of receiving freight, unless there are extenuating 
circumstances on the part of the final customer.     
Special Requests: 
 
Receiving/Dock Procedures – All freight must be received regardless of damage.    If there is carton 
damage or visible damage to the product, notate the damage on the BOL, take pictures and notify NSD 
immediately.    Do NOT call the final consignee to schedule.   
Scheduling – When calling the customer, please make sure you represent yourself as a ServiceByAir 
employee.    This will help alleviate some confusion with scheduling.    NonstopDelivery has provided a 
call sheet.    This call sheet must be filled out completely when calling the customer to schedule.   
Please be sure to file this with the NSD delivery paperwork as you may be requested to provide it if any 
issues with scheduling or the delivery services arise.    If this is not filled out properly and the questions 
are not asked of the customer at the time of scheduling, you may be requested to return to the 
customer's location at a later date to complete the delivery. 
Assembly – Assembly is required on all deliveries of the T4 and T4R models as well as the T5 orders that 
reflect "split" in the product description (The normal T5 Nusteps ship fully assembled).    The drivers 
may need to offer this service even if the customer does not request it.    If the customer refuses 
assembly, NSD must be called while the drivers are on‐site to authorize.    If this is not completed, you 
may be asked to return to the site to complete the assembly.    The assembly instructions are attached 
and should not take more than 30 minutes to complete (View the T4R instructions on pages 3 & 4, the 
T5 split instructions on pages 5‐9 and the T4 instructions start on page 10).    Any additional assembly 
time will need to be validated before NSD will authorize payment. 
Tools – For the T4R model, a 9/16" socket wrench is needed.    For the T4 model, a Philips head screw 
driver is needed.    For the T5 split model, a 3/8" drive ratchet is needed.    Please make sure your 
drivers are prepared with the appropriate equipment when making these deliveries. 
Stairs – For the T4, T4R and T5 split models, NSD is expected to carry the freight up or down stairs as 
requested by the customer.    The T5 model that ships FULLY ASSEMBELED is sold as a first floor or 

Advertisement

loading
Need help?

Need help?

Do you have a question about the T4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Nustep T4

  • Page 1   This call sheet must be filled out completely when calling the customer to schedule.    Please be sure to file this with the NSD delivery paperwork as you may be requested to provide it if any  issues with scheduling or the delivery services arise.    If this is not filled out properly and the questions  are not asked of the customer at the time of scheduling, you may be requested to return to the  customer’s location at a later date to complete the delivery.  Assembly – Assembly is required on all deliveries of the T4 and T4R models as well as the T5 orders that  reflect “split” in the product description (The normal T5 Nusteps ship fully assembled).    The drivers  may need to offer this service even if the customer does not request it.    If the customer refuses  assembly, NSD must be called while the drivers are on‐site to authorize.    If this is not completed, you  may be asked to return to the site to complete the assembly.    The assembly instructions are attached  and should not take more than 30 minutes to complete (View the T4R instructions on pages 3 & 4, the  T5 split instructions on pages 5‐9 and the T4 instructions start on page 10).    Any additional assembly  time will need to be validated before NSD will authorize payment.  Tools – For the T4R model, a 9/16” socket wrench is needed.    For the T4 model, a Philips head screw  driver is needed.    For the T5 split model, a 3/8” drive ratchet is needed.    Please make sure your  drivers are prepared with the appropriate equipment when making these deliveries.  Stairs – For the T4, T4R and T5 split models, NSD is expected to carry the freight up or down stairs as  requested by the customer.    The T5 model that ships FULLY ASSEMBELED is sold as a first floor or ...
  • Page 2   If the customer requests delivery of a T5 that it not shipped disassembled to a  room that requires the delivery team to carry it up or down a flight of stairs, please contact NSD while  on‐site.  Pickup and Packaging – NSD may pick up existing NuStep machines while on‐site for the delivery.    The  need for this pickup will be indicated by a return order in the system.    If the customer asks to keep the  bike or if they request a pickup that has not been entered into the system, NSD must be called while the  drivers are on‐site to authorize.    If this is not completed, you may be asked to return to the site to  recover the equipment.    Once at your dock, please package the NuStep with cardboard and shrink  wrap and palletize the freight.    This is expected to be completed within 48hrs of pickup.    NSD will  send a BOL for the routing from your dock.  Attempted Deliveries/Detention Time – In order to mitigate expenses, NSD must be notified while the  driver is on‐site if there is any detention time caused by the customer or an attempted delivery.    If this  is not completed, NSD may not be able to pay the additional charges.    Delivery:    To properly deliver the freight for a white glove delivery, please follow the steps below: 1. When you arrive at the customer’s location, do not use the driveway but park curbside.    2. Have one of the delivery personnel complete a walkthrough with the customer to avoid  any unexpected obstructions or obstacles to the delivery.  3. Take the product to the place of choice inside the customer’s location and unpack it. ...
  • Page 3: Tools Required

    E-tube ” 9/16 and the mounting bracket HOLD TUBE! Nustep, Inc. • Venture Dr. Ann Arbor MI 48108 USA • Customer Support 800-322-4434 45580 – Instruction – T4 Delivery and Installation, Draft Page 1 of 2...
  • Page 4 Position 7. Return E-tube mounting back to rest on Covers Ready to NuStep! Nustep, Inc. • Venture Dr. Ann Arbor MI 48108 USA • Customer Support 800-322-4434 45580 – Instruction – T4 Delivery and Installation, Draft Page 2 of 2...
  • Page 5   T5/T5xr 2P DELIVERY INSTALLATION GUIDELINES        PLEASE READ GUIDELINES COMPLETELY BEFORE BEGINNING.  Call Customer Service with any questions at 800‐322‐4434.  Specifications subject to change without notice. These are guidelines that may help delivery, however, delivery personnel  need to evaluate the delivery situation and make an appropriate decision as to what the best practice should be.  CAUTION indicates a  potentially hazardous  situation, which if not  avoided, may result in  minor or moderate injury.   Tool List (Not Included)   NuStep, Inc. 5111 Venture Dr Ann Arbor MI 48108 USA  Customer Service 800‐322‐4434 support@nustep.com   PN 51705 T5/T5xr 2P Delivery Installation Guideline, Rev A   ...
  • Page 6 4 or 5 inches otherwise front covers may rub on pallet.) 3. Lift unit front end and move skid out of way with two people minimum. 4. Remove bag with tools and installation hardware from console.   NuStep, Inc. 5111 Venture Dr Ann Arbor MI 48108 USA  Customer Service 800‐322‐4434 support@nustep.com   PN 51705 T5/T5xr 2P Delivery Installation Guideline, Rev A   ...
  • Page 7 6. Fully separate the two pieces. 7. Transport rear piece of unit with two people minimum. 8. Transport front piece of unit with two people minimum.   NuStep, Inc. 5111 Venture Dr Ann Arbor MI 48108 USA  Customer Service 800‐322‐4434 support@nustep.com   PN 51705 T5/T5xr 2P Delivery Installation Guideline, Rev A   ...
  • Page 8 11. Slide two pieces fully together. 12. Install two fasteners on each side of frame just below lower arm weldments. Tighten bolts to 300 in-lbs (33 Nm) ± 10%.   NuStep, Inc. 5111 Venture Dr Ann Arbor MI 48108 USA  Customer Service 800‐322‐4434 support@nustep.com   PN 51705 T5/T5xr 2P Delivery Installation Guideline, Rev A   ...
  • Page 9 13. Place lower arm flange cover over lower arm. 14. Install three screws in lower arm flange cover. Repeat step 13 and 14 for opposite side lower arm flange cover.     NuStep, Inc. 5111 Venture Dr Ann Arbor MI 48108 USA  Customer Service 800‐322‐4434 support@nustep.com   PN 51705 T5/T5xr 2P Delivery Installation Guideline, Rev A   ...

This manual is also suitable for:

T5xrT5Trs 4000Account 4504