Inspection; Assembly - Rotax 2005 717 RFI Engine Shop Manual

Engines
Table of Contents

Advertisement

Section 03 787 RFI ENGINE
Subsection 04 (BOTTOM END)
FIRST PASS
SECOND PASS
Finish the cleaning with acetone.
CAUTION: Be careful not to spray cleaner on
the painted surface of the engine. Do not wipe
with rags. Use a new clean hand towel only.

INSPECTION

Refer to table below to find bottom end dimension
specifications. For measurement procedures, re-
fer to ENGINE MEASUREMENT.
94
MEASUREMENT
Crankshaft
deflection MAG
Crankshaft
deflection CENTER
Crankshaft
deflection PTO
Connecting rod big
end axial play
Crankcase
Inspect plane surfaces for warpage. Small defor-
mation can be corrected by grinding surface with
a fine sandpaper. Install sandpaper on a surface
plate and rub part against oiled sand paper.
Bearing
Inspect crankshaft bearings no. 4. Check for cor-
rosion, scoring, pitting, chipping or other evidence
of wear. Make sure plastic cage is not melted.
Rotate and make sure they turn smoothly.

ASSEMBLY

Assembly is essentially the reverse of disassem-
bly procedures. However pay particular attention
to the following.
NOTE: It is recommended to spray injection oil on
all moving parts when reassembling the engine.
Crankshaft End Bearings
Heat up the bearing(s) using the bearing heater
(P/N 529 035 969). This will expand bearings and
ease installation.
www.SeaDooManuals.net
TOLERANCE
WEAR
NEW PART
LIMIT
mm (in)
N.A.
0.05 (.020)
N.A.
0.08 (.003)
N.A.
0.03 (.001)
min. 0.230 (.008)
1.2 (.047)
max. 0.617 (.024)
smr2005-083

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Rotax 2005 717 RFI

This manual is also suitable for:

2005 787 rfi

Table of Contents